STUDY OF THE EVALUATION OF 10 KWP ON- GRID SOLAR POWER SYSTEM AT PLTD SIANTAN

Agum Rahmansyah, A. Hiendro, K. H. Khwee
{"title":"STUDY OF THE EVALUATION OF 10 KWP ON- GRID SOLAR POWER SYSTEM AT PLTD SIANTAN","authors":"Agum Rahmansyah, A. Hiendro, K. H. Khwee","doi":"10.26418/telectrical.v1i3.75489","DOIUrl":null,"url":null,"abstract":"The use of fossil fuels as an energy source remains a primary priority today. However, renewable energy is a potential alternative to support the availability of fossil fuels. Renewable energy is derived from natural sources and has sustainable characteristics, such as solar, wind, and hydro power. Solar Power Plants are one of the electrical energy sources that utilize the sun as their primary source. Indonesia, located on the equator, has abundant solar energy with an average solar radiation intensity of around 4.8 kWh/m^2 per day throughout the country, especially in Pontianak, which is situated on the equator. This research focuses on the evaluation study of an On-Grid Solar Power System located at PLTD Siantan. The objective of this study is to determine the amount of energy generated and conduct economic analysis and feasibility analysis of the On-Grid Solar Power System using three methods: Net Present Value (NPV), Profitability Index (PI), and Payback Period (PP). The data collection and calculations revealed that the average energy produced by the Solar Power System at PLTD Siantan is 29.14 kWp. There are a total of 20 installed solar panels, each with a power of 560W, and one inverter with a capacity of 10 kW. The investment cost for the Solar Power System is IDR. 180,868,506.00. The economic feasibility analysis of the Solar Power System using the three methods resulted in an NPV of IDR. 213,645,234.00, a PI value of 2.18, and a PP value of 14 years","PeriodicalId":517333,"journal":{"name":"Telecommunications, Computers, and Electricals Engineering Journal","volume":"201 ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Telecommunications, Computers, and Electricals Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/telectrical.v1i3.75489","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The use of fossil fuels as an energy source remains a primary priority today. However, renewable energy is a potential alternative to support the availability of fossil fuels. Renewable energy is derived from natural sources and has sustainable characteristics, such as solar, wind, and hydro power. Solar Power Plants are one of the electrical energy sources that utilize the sun as their primary source. Indonesia, located on the equator, has abundant solar energy with an average solar radiation intensity of around 4.8 kWh/m^2 per day throughout the country, especially in Pontianak, which is situated on the equator. This research focuses on the evaluation study of an On-Grid Solar Power System located at PLTD Siantan. The objective of this study is to determine the amount of energy generated and conduct economic analysis and feasibility analysis of the On-Grid Solar Power System using three methods: Net Present Value (NPV), Profitability Index (PI), and Payback Period (PP). The data collection and calculations revealed that the average energy produced by the Solar Power System at PLTD Siantan is 29.14 kWp. There are a total of 20 installed solar panels, each with a power of 560W, and one inverter with a capacity of 10 kW. The investment cost for the Solar Power System is IDR. 180,868,506.00. The economic feasibility analysis of the Solar Power System using the three methods resulted in an NPV of IDR. 213,645,234.00, a PI value of 2.18, and a PP value of 14 years
研究评估西安坦 10 kwp 并网太阳能发电系统
使用化石燃料作为能源仍然是当今的首要任务。然而,可再生能源是支持化石燃料供应的潜在替代能源。可再生能源来源于自然,具有可持续的特点,如太阳能、风能和水能。太阳能发电厂是以太阳为主要能源的电力来源之一。印度尼西亚位于赤道上,太阳能资源丰富,全国平均每天的太阳辐射强度约为 4.8 kWh/m^2,尤其是位于赤道上的坤甸市。本研究的重点是对位于 PLTD Siantan 的并网太阳能发电系统进行评估研究。本研究的目的是确定所产生的能量,并使用三种方法对并网太阳能发电系统进行经济分析和可行性分析:净现值 (NPV)、盈利指数 (PI) 和投资回收期 (PP)。数据收集和计算显示,PLTD Siantan 太阳能发电系统的平均发电量为 29.14 kWp。总共安装了 20 块太阳能电池板,每块的功率为 560 瓦,还有一个容量为 10 千瓦的逆变器。太阳能发电系统的投资成本为 180,868,506.00 印度卢比。180,868,506.00.使用三种方法对太阳能发电系统进行经济可行性分析后,得出的净现值为 213,645,234 印尼盾。213,645,234.00 印尼盾,PI 值为 2.18,PP 值为 14 年。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信