{"title":"Municipal perspectives on managed retreat and flood mitigation: A case analysis of Merritt, Canada after the 2021 British Columbia flood disaster","authors":"Shaieree Cottar, Johanna Wandel","doi":"10.1007/s10584-024-03707-4","DOIUrl":null,"url":null,"abstract":"<p>In response to the catastrophic flooding that occurred in British Columbia, Canada in November 2021, the City of Merritt is facing a difficult decision about whether to rebuild or not. The developing situation in Merritt provided a unique opportunity to explore the different types of adaptations (i.e., investments in climate resilient infrastructure, rebuilding, construction of structural mitigation, zoning, and buyouts) considered by policymakers in advance of official municipal decisions. Through qualitative mixed methods (e.g., interviews, open houses, town council meetings), the study explored preliminary discussions among decision makers surrounding long term risk reduction options including rebuild and retreat strategies, perceptions of flood risk, recovery challenges faced by small-scale municipalities, the development of the community’s flood mitigation plan, and recommendations for post-disaster transitional supports. The results indicated that communities in the post-disaster recovery phase are considering the use of buyouts as a risk reduction tool amongst broader flood mitigation strategies, however policy constraints and a lack of funding are impeding the implementation of a flood mitigation plan that includes buyouts. The findings suggest that decisions about post disaster recovery are often independent of broader municipal climate change adaptation plans instead focusing on short-term risk reduction mechanisms. Additionally, transitional supports including interim housing need to be accounted for in recovery planning. Governments in Canada can capitalize on the policy windows during the post-disaster recovery stage and learn from municipalities about the challenges and opportunities in the design and implementation of flood mitigation plans that can help to improve disaster policy.</p>","PeriodicalId":10372,"journal":{"name":"Climatic Change","volume":null,"pages":null},"PeriodicalIF":4.8000,"publicationDate":"2024-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Climatic Change","FirstCategoryId":"93","ListUrlMain":"https://doi.org/10.1007/s10584-024-03707-4","RegionNum":2,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENVIRONMENTAL SCIENCES","Score":null,"Total":0}
引用次数: 0

Abstract

In response to the catastrophic flooding that occurred in British Columbia, Canada in November 2021, the City of Merritt is facing a difficult decision about whether to rebuild or not. The developing situation in Merritt provided a unique opportunity to explore the different types of adaptations (i.e., investments in climate resilient infrastructure, rebuilding, construction of structural mitigation, zoning, and buyouts) considered by policymakers in advance of official municipal decisions. Through qualitative mixed methods (e.g., interviews, open houses, town council meetings), the study explored preliminary discussions among decision makers surrounding long term risk reduction options including rebuild and retreat strategies, perceptions of flood risk, recovery challenges faced by small-scale municipalities, the development of the community’s flood mitigation plan, and recommendations for post-disaster transitional supports. The results indicated that communities in the post-disaster recovery phase are considering the use of buyouts as a risk reduction tool amongst broader flood mitigation strategies, however policy constraints and a lack of funding are impeding the implementation of a flood mitigation plan that includes buyouts. The findings suggest that decisions about post disaster recovery are often independent of broader municipal climate change adaptation plans instead focusing on short-term risk reduction mechanisms. Additionally, transitional supports including interim housing need to be accounted for in recovery planning. Governments in Canada can capitalize on the policy windows during the post-disaster recovery stage and learn from municipalities about the challenges and opportunities in the design and implementation of flood mitigation plans that can help to improve disaster policy.

Abstract Image

市政当局对有管理的撤退和洪水缓解的看法:2021 年不列颠哥伦比亚省洪灾后加拿大梅里特的案例分析
针对 2021 年 11 月在加拿大不列颠哥伦比亚省发生的灾难性洪灾,梅里特市正面临着是否重建的艰难抉择。梅里特市的发展形势为我们提供了一个独特的机会,以探索决策者在做出正式市政决策之前所考虑的不同类型的适应措施(即投资于气候适应性基础设施、重建、建造结构性减灾设施、分区和买断)。通过定性混合方法(如访谈、开放日、市议会会议),该研究探讨了决策者围绕长期降低风险方案(包括重建和撤退战略)、对洪水风险的看法、小规模城市面临的恢复挑战、社区洪水缓解计划的制定以及灾后过渡支持建议等问题进行的初步讨论。研究结果表明,处于灾后恢复阶段的社区正在考虑将买断作为更广泛的洪灾减灾战略中的一种降低风险的工具,但是政策限制和资金短缺阻碍了包括买断在内的洪灾减灾计划的实施。研究结果表明,有关灾后恢复的决策往往独立于更广泛的市政气候变化适应计划,而是侧重于短期风险降低机制。此外,在灾后恢复规划中还需要考虑包括临时住房在内的过渡性支持。加拿大政府可以利用灾后恢复阶段的政策窗口期,向市政当局学习在设计和实施洪水缓解计划方面的挑战和机遇,从而帮助改进灾害政策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Climatic Change
Climatic Change 环境科学-环境科学
CiteScore
10.20
自引率
4.20%
发文量
180
审稿时长
7.5 months
期刊介绍: Climatic Change is dedicated to the totality of the problem of climatic variability and change - its descriptions, causes, implications and interactions among these. The purpose of the journal is to provide a means of exchange among those working in different disciplines on problems related to climatic variations. This means that authors have an opportunity to communicate the essence of their studies to people in other climate-related disciplines and to interested non-disciplinarians, as well as to report on research in which the originality is in the combinations of (not necessarily original) work from several disciplines. The journal also includes vigorous editorial and book review sections.
文献相关原料
公司名称 产品信息 采购帮参考价格
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信