Empirical Investigation of Interface Management and Its Sway in the Construction Project - Evidence from India

Vijayabanu Chidambram, Rathinakumar Vedachalam, Januppriya Govindhan
{"title":"Empirical Investigation of Interface Management and Its Sway in the Construction Project - Evidence from India","authors":"Vijayabanu Chidambram, Rathinakumar Vedachalam, Januppriya Govindhan","doi":"10.56889/nwtm8376","DOIUrl":null,"url":null,"abstract":"Management practices play a key role in mega projects, and the complexity of large-scale construction processes increases because of their multidisciplinary design, which can be minimized with the help of interface management. The current study aims to analyze the interface factors of construction projects, such as construction material, labor, financial, equipment, and contract condition interfaces, towards the construction project performance - such as impact on cost, time, quality, and customer satisfaction. The study's target demographic was everyone in the building projects, both directly and indirectly, such as engineers, architects, contractors, subcontractors, constructors, and promoters in select cities of Tamil Nadu. A total of 81 samples were collected and analyzed using the Smart PLS Model. It is concluded that having an interface management team in the construction drives the team towards their goals and maintains standards of the project’s design and quality with an R square value of 0.495.","PeriodicalId":371624,"journal":{"name":"European Project Management Journal","volume":"45 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Project Management Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56889/nwtm8376","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Management practices play a key role in mega projects, and the complexity of large-scale construction processes increases because of their multidisciplinary design, which can be minimized with the help of interface management. The current study aims to analyze the interface factors of construction projects, such as construction material, labor, financial, equipment, and contract condition interfaces, towards the construction project performance - such as impact on cost, time, quality, and customer satisfaction. The study's target demographic was everyone in the building projects, both directly and indirectly, such as engineers, architects, contractors, subcontractors, constructors, and promoters in select cities of Tamil Nadu. A total of 81 samples were collected and analyzed using the Smart PLS Model. It is concluded that having an interface management team in the construction drives the team towards their goals and maintains standards of the project’s design and quality with an R square value of 0.495.
界面管理及其在建筑项目中的作用的实证调查--来自印度的证据
管理实践在超大型项目中发挥着关键作用,由于其多学科设计,大型施工过程的复杂性也随之增加,而借助界面管理可以将复杂性降至最低。本研究旨在分析建筑项目的界面因素,如建筑材料、劳动力、财务、设备和合同条件界面,对建筑项目绩效的影响,如对成本、时间、质量和客户满意度的影响。研究的目标人群是泰米尔纳德邦部分城市中直接或间接参与建筑项目的所有人,如工程师、建筑师、承包商、分包商、建筑商和发起人。共收集了 81 个样本,并使用智能 PLS 模型进行了分析。研究得出的结论是,在建筑工程中建立一个界面管理团队能够推动团队实现其目标,并保持项目设计和质量的标准,R 平方值为 0.495。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
0.80
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信