STUDY OF COMMUNAL BASIUNI IMRAN ISLAMIC BOARDING SCHOOL WASTEWATER TREATMENT PLANT (WWTP) IN SAMBAS REGENCY

Medina Andini, Isna Apriani, Suci Pramadita
{"title":"STUDY OF COMMUNAL BASIUNI IMRAN ISLAMIC BOARDING SCHOOL WASTEWATER TREATMENT PLANT (WWTP) IN SAMBAS REGENCY","authors":"Medina Andini, Isna Apriani, Suci Pramadita","doi":"10.26418/jts.v23i4.67384","DOIUrl":null,"url":null,"abstract":"Islamic Boarding School has a treatment capacity of 33 m3 and an area of 24 m2. Based on the results of initial wastewater quality tests on communal WWTP, the TSS, COD, and BOD parameters are above the quality standard threshold based on the Wastewater Quality Standard of the Minister of Environment Regulation Number 68 of 2016. This evaluation aims to determine the processing efficiency of communal WWTP and evaluate the processing unit in communal WWTP as well as alternative improvements that effectively reduce the parameters of pH, TSS, BOD, COD, and fatty oils. This research method is descriptive analytics, which analyses problems from data collected descriptively to find solutions to problems. The results of this evaluation show that the TSS, COD, and BOD parameters are above the quality standard threshold. The pH parameter increased by 3.6%, removal efficiency for BOD by 76.4%, COD by 71.9%, TSS by 84.3%, and oil grease by 91.9%. Alternative WWTP improvements are carried out by redesigning the Communal WWTP, which consists of calculating the equalization unit, precipitator I, anaerobic filter, Precipitator II, disinfection, and sludge thickener, Sludge digester, sludge drying bed and analysis of the Budget Plan Cost (RAB). The communal WWTP redesign requires a land area of 52.62 m2 with a processing capacity of 56.8 m3 and a cost budget plan of Rp.157,224,000.00. The redesign results of this evaluation can reduce environmental impacts due to domestic wastewater.","PeriodicalId":52838,"journal":{"name":"Jurnal Teknik Sipil","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/jts.v23i4.67384","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Islamic Boarding School has a treatment capacity of 33 m3 and an area of 24 m2. Based on the results of initial wastewater quality tests on communal WWTP, the TSS, COD, and BOD parameters are above the quality standard threshold based on the Wastewater Quality Standard of the Minister of Environment Regulation Number 68 of 2016. This evaluation aims to determine the processing efficiency of communal WWTP and evaluate the processing unit in communal WWTP as well as alternative improvements that effectively reduce the parameters of pH, TSS, BOD, COD, and fatty oils. This research method is descriptive analytics, which analyses problems from data collected descriptively to find solutions to problems. The results of this evaluation show that the TSS, COD, and BOD parameters are above the quality standard threshold. The pH parameter increased by 3.6%, removal efficiency for BOD by 76.4%, COD by 71.9%, TSS by 84.3%, and oil grease by 91.9%. Alternative WWTP improvements are carried out by redesigning the Communal WWTP, which consists of calculating the equalization unit, precipitator I, anaerobic filter, Precipitator II, disinfection, and sludge thickener, Sludge digester, sludge drying bed and analysis of the Budget Plan Cost (RAB). The communal WWTP redesign requires a land area of 52.62 m2 with a processing capacity of 56.8 m3 and a cost budget plan of Rp.157,224,000.00. The redesign results of this evaluation can reduce environmental impacts due to domestic wastewater.
对桑巴斯县 Basiuni imran 伊斯兰寄宿学校废水处理厂(WWTP)的研究
伊斯兰寄宿学校的处理能力为 33 立方米,占地面积为 24 平方米。根据对社区污水处理厂进行的初步废水水质检测结果,总悬浮物、化学需氧量和生化需氧量参数均高于环境部 2016 年第 68 号法规《废水水质标准》规定的水质标准阈值。本次评估旨在确定公用污水处理厂的处理效率,评估公用污水处理厂的处理单元以及可有效降低 pH 值、TSS、BOD、COD 和脂肪油参数的其他改进方案。这种研究方法是描述性分析法,即从收集到的描述性数据中分析问题,从而找到解决问题的办法。评估结果显示,TSS、COD 和 BOD 参数高于质量标准阈值。pH 参数提高了 3.6%,BOD 去除效率提高了 76.4%,COD 提高了 71.9%,TSS 提高了 84.3%,油脂提高了 91.9%。通过重新设计公用污水处理厂,对公用污水处理厂进行了替代性改进,包括计算均衡装置、沉淀池 I、厌氧过滤器、沉淀池 II、消毒、污泥浓缩器、污泥消化器、污泥干燥床和预算计划成本(RAB)分析。公用污水处理厂重新设计所需土地面积为 52.62 平方米,处理能力为 56.8 立方米,预算计划成本为 157,224,000.00 印尼盾。本次评估的重新设计结果可减少生活废水对环境造成的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信