Assessment of the feasibility of Aku small hydropower project using RETscreen Energy Model Software

O. Chinyere, Y. Sanusi, D. Kulla
{"title":"Assessment of the feasibility of Aku small hydropower project using RETscreen Energy Model Software","authors":"O. Chinyere, Y. Sanusi, D. Kulla","doi":"10.4314/njt.v42i4.8","DOIUrl":null,"url":null,"abstract":"The RETScreen 4 software was used in this study to conduct the analysis to determine the viability of the river Aku hydropower plant in  Uturu, Abia State. The study was carried out using data from Ivo river dam authority, previous studies and literatures. The result of the  study showed that the Aku river could generate an annual energy of 6,434,000kWh and will be able to payback its project cost at 6.3 years.  The estimated annual GHG reduction of the project stood at 4,310.7tCo2 an equivalent of 1,852,317 litres of gasoline not used. The sensitivity/risk analysis indicated that electricity export rate (electricity sales price), initial cost and debt interest rate impacted the project  profitability the most in that order. The project NPV is sensitive to both the debt interest rate and the initial cost of the project as variation  in cost above 30% will throw the project into a negative NPV. In the light of the available information, the project is feasible if  implemented. ","PeriodicalId":33360,"journal":{"name":"Nigerian Journal of Technology","volume":"43 19","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nigerian Journal of Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4314/njt.v42i4.8","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The RETScreen 4 software was used in this study to conduct the analysis to determine the viability of the river Aku hydropower plant in  Uturu, Abia State. The study was carried out using data from Ivo river dam authority, previous studies and literatures. The result of the  study showed that the Aku river could generate an annual energy of 6,434,000kWh and will be able to payback its project cost at 6.3 years.  The estimated annual GHG reduction of the project stood at 4,310.7tCo2 an equivalent of 1,852,317 litres of gasoline not used. The sensitivity/risk analysis indicated that electricity export rate (electricity sales price), initial cost and debt interest rate impacted the project  profitability the most in that order. The project NPV is sensitive to both the debt interest rate and the initial cost of the project as variation  in cost above 30% will throw the project into a negative NPV. In the light of the available information, the project is feasible if  implemented. 
使用 RETscreen 能源模型软件评估 Aku 小水电项目的可行性
本研究使用 RETScreen 4 软件进行分析,以确定阿比亚州乌图鲁阿库河水电站的可行性。研究使用了来自伊沃河大坝管理局、以往研究和文献的数据。研究结果表明,阿库河每年可发电 6,434,000 千瓦时,6.3 年即可收回项目成本。 据估计,该项目每年减少的温室气体排放量为 4,310.7 吨二氧化碳,相当于 1,852,317 升未使用的汽油。敏感性/风险分析表明,电力出口率(电力销售价格)、初始成本和债务利率对项目盈利能力的影响依次最大。项目净现值对债务利率和项目初始成本都很敏感,因为成本变化超过 30% 将使项目净现值为负值。从现有信息来看,如果实施该项目,该项目是可行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
0.10
自引率
0.00%
发文量
126
审稿时长
11 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信