Deployment of vaccine cold chain equipment in resource-limited settings: lessons from the Gavi Cold Chain Optimization Platform in Cameroon.

IF 2.3 4区 医学 Q2 PUBLIC, ENVIRONMENTAL & OCCUPATIONAL HEALTH
Jude Nkwain, Vouking Marius Zambou, Sangwe Clovis Nchinjoh, Valirie Ndip Agbor, Amani Adidja, Clarence Mbanga, Nnang Nadege Edwidge, Shalom Tchokfe Ndoula, Ateke Njoh Andreas, Demba Diack, Pietro Di Mattei, Owens Wiwa, Ousmane Diaby, Yauba Saidu
{"title":"Deployment of vaccine cold chain equipment in resource-limited settings: lessons from the Gavi Cold Chain Optimization Platform in Cameroon.","authors":"Jude Nkwain, Vouking Marius Zambou, Sangwe Clovis Nchinjoh, Valirie Ndip Agbor, Amani Adidja, Clarence Mbanga, Nnang Nadege Edwidge, Shalom Tchokfe Ndoula, Ateke Njoh Andreas, Demba Diack, Pietro Di Mattei, Owens Wiwa, Ousmane Diaby, Yauba Saidu","doi":"10.1093/inthealth/ihae010","DOIUrl":null,"url":null,"abstract":"<p><strong>Background: </strong>Lack of or use of suboptimal cold chain equipment (CCE) is a major barrier to optimal immunization coverage and equity. Gavi established the CCE optimization platform (CCEOP) in 2015 to help eligible countries modernize their cold chain systems. However, there are limited data on CCE deployment at country level. We present lessons learnt from deploying CCE from the Gavi CCEOP in Cameroon.</p><p><strong>Methods: </strong>This cross-sectional study collected data on the number of days items of CCE spent at each point on their trajectory from the entry port to 62 randomly selected health facilities in Cameroon.</p><p><strong>Results: </strong>Once equipment arrived at the entry port, it took 10 d for customs clearance, 2 d from customs clearance to warehousing and 257 d (>9 mo) from the warehouse to facilities. Upon arrival at the facilities, it took a median of 53 (range 0-395) d from installation to final commissioning: most of the days (median=210) were spent between installation and final commissioning. The major causes of delays included insufficient coordination and communication across all levels, poor documentation and final commissioning.</p><p><strong>Conclusion: </strong>Early engagement on customs clearance, strengthening coordination and communication, ensuring proper documentation, as well as eliminating final commissioning, could significantly improve implementation of the program.</p>","PeriodicalId":49060,"journal":{"name":"International Health","volume":null,"pages":null},"PeriodicalIF":2.3000,"publicationDate":"2024-02-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Health","FirstCategoryId":"3","ListUrlMain":"https://doi.org/10.1093/inthealth/ihae010","RegionNum":4,"RegionCategory":"医学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"PUBLIC, ENVIRONMENTAL & OCCUPATIONAL HEALTH","Score":null,"Total":0}
引用次数: 0

Abstract

Background: Lack of or use of suboptimal cold chain equipment (CCE) is a major barrier to optimal immunization coverage and equity. Gavi established the CCE optimization platform (CCEOP) in 2015 to help eligible countries modernize their cold chain systems. However, there are limited data on CCE deployment at country level. We present lessons learnt from deploying CCE from the Gavi CCEOP in Cameroon.

Methods: This cross-sectional study collected data on the number of days items of CCE spent at each point on their trajectory from the entry port to 62 randomly selected health facilities in Cameroon.

Results: Once equipment arrived at the entry port, it took 10 d for customs clearance, 2 d from customs clearance to warehousing and 257 d (>9 mo) from the warehouse to facilities. Upon arrival at the facilities, it took a median of 53 (range 0-395) d from installation to final commissioning: most of the days (median=210) were spent between installation and final commissioning. The major causes of delays included insufficient coordination and communication across all levels, poor documentation and final commissioning.

Conclusion: Early engagement on customs clearance, strengthening coordination and communication, ensuring proper documentation, as well as eliminating final commissioning, could significantly improve implementation of the program.

在资源有限的环境中部署疫苗冷链设备:喀麦隆 Gavi 冷链优化平台的经验教训。
背景:缺乏或使用次优冷链设备(CCE)是实现最佳免疫覆盖率和公平性的主要障碍。Gavi 于 2015 年建立了 CCE 优化平台(CCEOP),以帮助符合条件的国家实现冷链系统现代化。然而,在国家层面部署 CCE 的数据有限。我们介绍了喀麦隆从 Gavi CCEOP 部署 CCE 中汲取的经验教训:这项横断面研究收集了关于儿童早期教育物品从入境口岸到喀麦隆 62 家随机抽取的医疗机构途中在每个地点停留天数的数据:设备抵达入境口岸后,清关需要 10 天,从清关到入库需要 2 天,从入库到医疗机构需要 257 天(超过 9 个月)。设备运抵设施后,从安装到最终调试的时间中位数为 53 天(0-395 天不等):大部分天数(中位数=210 天)用在安装和最终调试之间。造成延误的主要原因包括各级协调和沟通不足、文件记录不全以及最终调试:结论:及早参与清关、加强协调和沟通、确保适当的文件记录以及取消最终调试,可显著改善计划的实施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
International Health
International Health PUBLIC, ENVIRONMENTAL & OCCUPATIONAL HEALTH-
CiteScore
4.50
自引率
0.00%
发文量
83
审稿时长
>12 weeks
期刊介绍: International Health is an official journal of the Royal Society of Tropical Medicine and Hygiene. It publishes original, peer-reviewed articles and reviews on all aspects of global health including the social and economic aspects of communicable and non-communicable diseases, health systems research, policy and implementation, and the evaluation of disease control programmes and healthcare delivery solutions. It aims to stimulate scientific and policy debate and provide a forum for analysis and opinion sharing for individuals and organisations engaged in all areas of global health.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信