Just-in-time scheduling problem with due windows and release dates for precast bridge girders

IF 3.1 4区 管理学 Q2 MANAGEMENT
Gang Liu, Hongwei Wang, Yong Xie
{"title":"Just-in-time scheduling problem with due windows and release dates for precast bridge girders","authors":"Gang Liu,&nbsp;Hongwei Wang,&nbsp;Yong Xie","doi":"10.1111/itor.13431","DOIUrl":null,"url":null,"abstract":"<p>As the prefabrication construction method plays an increasingly important role in the construction of cross-sea bridges, coordinating the schedule between off-site prefabrication and on-site assembly becomes crucial and challenging. This paper studies a just-in-time single-machine scheduling problem with due windows and release dates, which originates from the production and supply process of large segments of precast steel box girders in bridge construction. To solve this problem, we equivalently decompose it into the independent and same type of subproblems and formulate a mixed-integer linear mathematical programming model. Furthermore, we propose a branch-and-bound algorithm with the initialization of a novel linear early and tardy dispatching rule with due windows to solve the problem exactly. The dispatching rule, based on the local dominance criteria with due windows, is designed and used to improve the upper bound. Moreover, a lower bound is obtained by further decomposing and relaxing the subproblems. Finally, the parameter of the dispatching rule is calibrated, and the best search strategy of the branch-and-bound algorithm is determined. The comprehensive computational experiments carried out show the efficiency and effectiveness of the proposed branch-and-bound algorithm.</p>","PeriodicalId":49176,"journal":{"name":"International Transactions in Operational Research","volume":"31 4","pages":"2366-2398"},"PeriodicalIF":3.1000,"publicationDate":"2024-01-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Transactions in Operational Research","FirstCategoryId":"91","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1111/itor.13431","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

Abstract

As the prefabrication construction method plays an increasingly important role in the construction of cross-sea bridges, coordinating the schedule between off-site prefabrication and on-site assembly becomes crucial and challenging. This paper studies a just-in-time single-machine scheduling problem with due windows and release dates, which originates from the production and supply process of large segments of precast steel box girders in bridge construction. To solve this problem, we equivalently decompose it into the independent and same type of subproblems and formulate a mixed-integer linear mathematical programming model. Furthermore, we propose a branch-and-bound algorithm with the initialization of a novel linear early and tardy dispatching rule with due windows to solve the problem exactly. The dispatching rule, based on the local dominance criteria with due windows, is designed and used to improve the upper bound. Moreover, a lower bound is obtained by further decomposing and relaxing the subproblems. Finally, the parameter of the dispatching rule is calibrated, and the best search strategy of the branch-and-bound algorithm is determined. The comprehensive computational experiments carried out show the efficiency and effectiveness of the proposed branch-and-bound algorithm.

预制桥梁大梁的准时制排程问题(含到期窗口和放行日期
随着预制施工方法在跨海大桥建设中发挥越来越重要的作用,协调场外预制和现场组装之间的进度变得至关重要且极具挑战性。本文研究了一个具有到期窗口和放行日期的准时单机调度问题,该问题源于桥梁建设中大段预制钢箱梁的生产和供应过程。为了解决这个问题,我们将其分解为独立的同类型子问题,并制定了一个混合整数线性数学编程模型。此外,我们还提出了一种分支与边界算法,该算法初始化了一种带有到期窗口的新型线性提前和延迟调度规则,从而精确地解决了这一问题。该调度规则基于带到期窗口的局部优势准则,它的设计和使用提高了上界。此外,通过进一步分解和放松子问题,还得到了下限。最后,对调度规则的参数进行了校准,并确定了分支-约束算法的最佳搜索策略。综合计算实验表明,所提出的分支-约束算法是高效和有效的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
International Transactions in Operational Research
International Transactions in Operational Research OPERATIONS RESEARCH & MANAGEMENT SCIENCE-
CiteScore
7.80
自引率
12.90%
发文量
146
审稿时长
>12 weeks
期刊介绍: International Transactions in Operational Research (ITOR) aims to advance the understanding and practice of Operational Research (OR) and Management Science internationally. Its scope includes: International problems, such as those of fisheries management, environmental issues, and global competitiveness International work done by major OR figures Studies of worldwide interest from nations with emerging OR communities National or regional OR work which has the potential for application in other nations Technical developments of international interest Specific organizational examples that can be applied in other countries National and international presentations of transnational interest Broadly relevant professional issues, such as those of ethics and practice Applications relevant to global industries, such as operations management, manufacturing, and logistics.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信