Seismic Ground-Motion Design Criteria for Highway Bridges from the Perspective of Design Engineers

Ignatius (Po) Lam, Hubert Law, B. Maroney
{"title":"Seismic Ground-Motion Design Criteria for Highway Bridges from the Perspective of Design Engineers","authors":"Ignatius (Po) Lam, Hubert Law, B. Maroney","doi":"10.1177/03611981231212194","DOIUrl":null,"url":null,"abstract":"This paper presents the history and development of criteria for both the design response-spectrum method for ordinary, common bridges analyzed by the modal-superposition method, and the ground-motion time-history analysis method and inputs for designing major, important long-span bridges. This paper addresses various challenges encountered by the designers related to implementation of ground-motion design criteria.","PeriodicalId":309251,"journal":{"name":"Transportation Research Record: Journal of the Transportation Research Board","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-12-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transportation Research Record: Journal of the Transportation Research Board","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/03611981231212194","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents the history and development of criteria for both the design response-spectrum method for ordinary, common bridges analyzed by the modal-superposition method, and the ground-motion time-history analysis method and inputs for designing major, important long-span bridges. This paper addresses various challenges encountered by the designers related to implementation of ground-motion design criteria.
从设计工程师的角度看公路桥梁的地震地动设计标准
本文介绍了通过模态叠加法分析普通常见桥梁的设计响应谱方法和地动时程分析方法标准的历史和发展,以及设计重大、重要大跨度桥梁的输入。本文探讨了设计人员在实施地动设计标准时遇到的各种挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信