Assessing E-Compliance Maturity of Public Procurement Processes in Nigeria

Pub Date : 2023-12-27 DOI:10.11113/ijbes.v11.n1.1205
A. Aminu, M. Yamusa, Y. Ibrahim, M. Abdullahi, H. Ahmadu, B. Abdullahi, A. Ibrahim, Kabir Bala
{"title":"Assessing E-Compliance Maturity of Public Procurement Processes in Nigeria","authors":"A. Aminu, M. Yamusa, Y. Ibrahim, M. Abdullahi, H. Ahmadu, B. Abdullahi, A. Ibrahim, Kabir Bala","doi":"10.11113/ijbes.v11.n1.1205","DOIUrl":null,"url":null,"abstract":"The manual approach to public procurement is plagued with inefficiencies. To address these problems, efforts were made to digitize the processes in Nigeria. However, the e-compliance readiness of procurement processes is not known. This study attempts to assess e-compliance maturity of public procurement lifecycle in Nigeria. The study adopted a mixed research approach. A qualitative research method was used to establish criteria for evaluating the readiness of public procurement processes for digitization. Focus group interview with Six (6) automation and procurement professionals was conducted to arrive at the parameters used for the readiness assessment. Consequently, a questionnaire survey was administered on experienced public procurement professionals to evaluate the e-compliance readiness of some identified public procurement processes. Best to Worst Method (BWM) was used to evaluate e-compliance maturity level. The study shows that the processes are readily compliant for digitization.","PeriodicalId":0,"journal":{"name":"","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-12-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11113/ijbes.v11.n1.1205","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The manual approach to public procurement is plagued with inefficiencies. To address these problems, efforts were made to digitize the processes in Nigeria. However, the e-compliance readiness of procurement processes is not known. This study attempts to assess e-compliance maturity of public procurement lifecycle in Nigeria. The study adopted a mixed research approach. A qualitative research method was used to establish criteria for evaluating the readiness of public procurement processes for digitization. Focus group interview with Six (6) automation and procurement professionals was conducted to arrive at the parameters used for the readiness assessment. Consequently, a questionnaire survey was administered on experienced public procurement professionals to evaluate the e-compliance readiness of some identified public procurement processes. Best to Worst Method (BWM) was used to evaluate e-compliance maturity level. The study shows that the processes are readily compliant for digitization.
分享
查看原文
评估尼日利亚公共采购流程的电子合规成熟度
手工操作的公共采购方式效率低下。为解决这些问题,尼日利亚努力实现采购流程的数字化。然而,采购流程的电子合规准备情况却不得而知。本研究试图评估尼日利亚公共采购生命周期的电子合规成熟度。研究采用了混合研究方法。采用定性研究方法来制定评估公共采购流程数字化准备程度的标准。对六(6)名自动化和采购专业人员进行了焦点小组访谈,以得出用于准备情况评估的参数。随后,对经验丰富的公共采购专业人员进行了问卷调查,以评估一些已确定的公共采购流程的电子合规准备情况。采用从最佳到最差法(BWM)来评估电子合规成熟度。研究结果表明,这些流程随时符合数字化要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信