Improving allocation and layout in production logistics

IF 0.8 Q4 ENGINEERING, INDUSTRIAL
Martin Straka, Peter Kačmáry, Petr Besta
{"title":"Improving allocation and layout in production logistics","authors":"Martin Straka, Peter Kačmáry, Petr Besta","doi":"10.22306/al.v10i4.434","DOIUrl":null,"url":null,"abstract":"The article deals with the principled solution of allocation and layout of workplaces in a company producing of variety building components. Allocation and layout are very important areas for ensuring the efficient operation of companies engaged in production as well as in commercial activities. Both allocation and layout solutions have a strategic importance for companies. The investigated company produces construction metal elements as a part of modern construction technologies. The problem is related to the constant improving activities in the company in order to ensure its competitiveness on the market. The production process of construction metal elements consists of workplaces such as cutting, drilling, milling, welding and galvanizing. Workplaces for inspection and loading of finished products are non-production. The solution of the project was aimed at streamlining activities in terms of logistics, material flows as well as in terms of safety.","PeriodicalId":36880,"journal":{"name":"Acta Logistica","volume":"26 7","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2023-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Logistica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22306/al.v10i4.434","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

The article deals with the principled solution of allocation and layout of workplaces in a company producing of variety building components. Allocation and layout are very important areas for ensuring the efficient operation of companies engaged in production as well as in commercial activities. Both allocation and layout solutions have a strategic importance for companies. The investigated company produces construction metal elements as a part of modern construction technologies. The problem is related to the constant improving activities in the company in order to ensure its competitiveness on the market. The production process of construction metal elements consists of workplaces such as cutting, drilling, milling, welding and galvanizing. Workplaces for inspection and loading of finished products are non-production. The solution of the project was aimed at streamlining activities in terms of logistics, material flows as well as in terms of safety.
改进生产物流的分配和布局
这篇文章论述了在一家生产各种建筑构件的公司中工作场所分配和布局的原则性解决方案。分配和布局是确保从事生产和商业活动的公司高效运营的重要领域。分配和布局解决方案对公司具有重要的战略意义。被调查公司生产的建筑金属构件是现代建筑技术的一部分。问题与公司为确保市场竞争力而不断改进活动有关。建筑金属构件的生产过程包括切割、钻孔、铣削、焊接和镀锌等工序。检查和装载成品的车间属于非生产车间。该项目的解决方案旨在简化物流、物料流和安全方面的活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Acta Logistica
Acta Logistica Engineering-Industrial and Manufacturing Engineering
CiteScore
1.80
自引率
28.60%
发文量
36
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信