Case Study in Hypothesis Prioritization with Ishikawa Diagrams

IF 1.4 Q4 ENGINEERING, INDUSTRIAL
Matthew Barsalou
{"title":"Case Study in Hypothesis Prioritization with Ishikawa Diagrams","authors":"Matthew Barsalou","doi":"10.2478/mspe-2023-0042","DOIUrl":null,"url":null,"abstract":"Abstract The objective of this paper is to explore a multidisciplinary problem-solving team investigating a customer-reported failure using an Ishikawa diagram with a spreadsheet for prioritizing and tracking investigation actions in a manufacturing organization. A case study methodology is used with the actions taken to investigate a customer-reported failure explained. The highest priority failure hypothesis was found to be unrelated to the failure. Two medium-rated hypotheses were found to be causing the problem; leakage was occurring at the connection between two components due to a diameter deviation of one of the components. Identifying and prioritizing hypotheses from the Ishikawa diagram provided structure to the investigation and gave the investigation team leader a tool for tracking the investigation actions. This approach is suitable for all types of failure investigations in which an Ishikawa diagram is used to list hypotheses.","PeriodicalId":44097,"journal":{"name":"Management Systems in Production Engineering","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Management Systems in Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/mspe-2023-0042","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract The objective of this paper is to explore a multidisciplinary problem-solving team investigating a customer-reported failure using an Ishikawa diagram with a spreadsheet for prioritizing and tracking investigation actions in a manufacturing organization. A case study methodology is used with the actions taken to investigate a customer-reported failure explained. The highest priority failure hypothesis was found to be unrelated to the failure. Two medium-rated hypotheses were found to be causing the problem; leakage was occurring at the connection between two components due to a diameter deviation of one of the components. Identifying and prioritizing hypotheses from the Ishikawa diagram provided structure to the investigation and gave the investigation team leader a tool for tracking the investigation actions. This approach is suitable for all types of failure investigations in which an Ishikawa diagram is used to list hypotheses.
利用石川图表确定假设优先次序的案例研究
摘要本文的目的是探索一个多学科问题解决团队,使用石川图和电子表格来调查客户报告的故障,以便在制造组织中优先考虑和跟踪调查行动。案例研究方法用于调查客户报告的故障所采取的行动。发现最高优先级失效假设与失效无关。两个中等等级的假设被发现导致了这个问题;由于其中一个组件的直径偏差,两个组件之间的连接处发生泄漏。从Ishikawa图中识别和优先考虑假设为调查提供了结构,并为调查小组负责人提供了跟踪调查行动的工具。这种方法适用于使用石川图列出假设的所有类型的失效调查。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
4.30
自引率
13.30%
发文量
48
审稿时长
10 weeks
文献相关原料
公司名称 产品信息 采购帮参考价格
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信