{"title":"Model 5D Gedung Dekanat dan Perkuliahan Fakultas Kesehatan Masyarakat, Universitas Diponegoro","authors":"Muhammad Ar Rayyan Firdaus, Rahma Uyun Asalina, Asri Nurdiana, Bambang Setiabudi","doi":"10.14710/pilars.1.3.2023.45-59","DOIUrl":null,"url":null,"abstract":"Redesign is the critical point of the construction process which aims to provide technical specification requirements that will be used at the project later. In project planning, more time and accuracy are needed to obtain the required output. Therefore, it is necessary to use BIM or Building Information Modeling software to simplify, speed up and minimize errors due to human error. This Project was made a redesign the Dean's Building and Lecture project of the Faculty of Public Health, Diponegoro University using the BIM or Building Information Modeling application which aims to streamline structural, planning work, financing estimation, and scheduling processes. The method used is a literature study with the main data of design drawing and others data from the construction project of the Dean Building and Lectures of the Faculty of Public Health, Diponegoro University. The preparation of this Project goes through 3 stages. The first stage is to redesign the FKM Building project using Autodes Revit, the second stage is analyzing the structure with SAP 2000 and Ms Excel applications then the third stage is replanning cost estimation and scheduling using Ms Excel and Ms Project. The result of this Final Project is to obtain new best drawings, material specifications, cost estimation and scheduling.","PeriodicalId":499903,"journal":{"name":"Jurnal Sipil dan Arsitektur","volume":"96 16","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Sipil dan Arsitektur","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.14710/pilars.1.3.2023.45-59","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Redesign is the critical point of the construction process which aims to provide technical specification requirements that will be used at the project later. In project planning, more time and accuracy are needed to obtain the required output. Therefore, it is necessary to use BIM or Building Information Modeling software to simplify, speed up and minimize errors due to human error. This Project was made a redesign the Dean's Building and Lecture project of the Faculty of Public Health, Diponegoro University using the BIM or Building Information Modeling application which aims to streamline structural, planning work, financing estimation, and scheduling processes. The method used is a literature study with the main data of design drawing and others data from the construction project of the Dean Building and Lectures of the Faculty of Public Health, Diponegoro University. The preparation of this Project goes through 3 stages. The first stage is to redesign the FKM Building project using Autodes Revit, the second stage is analyzing the structure with SAP 2000 and Ms Excel applications then the third stage is replanning cost estimation and scheduling using Ms Excel and Ms Project. The result of this Final Project is to obtain new best drawings, material specifications, cost estimation and scheduling.
迪波内戈罗大学公共卫生学院院长办公室和报告厅 5D 模型
重新设计是施工过程的关键点,旨在提供将在项目中使用的技术规范要求。在项目规划中,需要更多的时间和准确性来获得所需的输出。因此,有必要使用BIM或Building Information Modeling软件来简化、加速和减少人为错误造成的错误。该项目是对迪波尼戈罗大学公共卫生学院院长大楼和讲座项目的重新设计,使用BIM或建筑信息模型应用程序,旨在简化结构、规划工作、融资估算和调度流程。使用的方法是文献研究法,主要数据是设计图,其他数据来自迪波涅戈罗大学院长楼建设项目和公共卫生学院讲座。本项目的准备工作分为三个阶段。第一阶段是使用Autodes Revit重新设计FKM Building项目,第二阶段是使用SAP 2000和Ms Excel应用程序分析结构,然后第三阶段是使用Ms Excel和Ms project重新规划成本估算和调度。最终项目的结果是获得新的最佳图纸,材料规格,成本估算和调度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信