{"title":"Challenges in implementing building information modelling for facility management in government buildings in Thailand","authors":"Nahathai Boontae, Mongkol Ussavadilokrit","doi":"10.1108/pm-02-2023-0017","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>Effective facility management (FM) can reduce environmental effects on buildings throughout their life cycle. This study aims to investigate the challenges in implementing building information modelling (BIM) for FM in government buildings in Thailand.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>Eight government-building facility experts were interviewed using an in-depth interview method to identify FM challenges. The collected qualitative data were analysed via thematic analysis to ensure data saturation. The final questionnaire was designed with 45 FM problems, classified into management, technical and human resource problems, to collect quantitative data from 54 government FM officers. The data were used to prioritise the severity and frequency of the FM problems using the severity index (SI) and relative importance index (RII).</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>Management problems have the highest impact, with an average SI of 0.285, followed by human resource (average SI = 0.266) and technical (average SI = 0.264) problems.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>This study identifies the government-building FM problems in Thailand that are critical to the development of a BIM execution plan (BEP) guideline. The findings can facilitate strategy development for government-building operations and management in line with the public procurement and supply administration of Thailand. These findings can serve as a guideline to inform the development of a BIM Roadmap for integration into the national digital roadmap and the Thailand 4.0 policy to mitigate construction-related environmental and climate issues.</p><!--/ Abstract__block -->","PeriodicalId":46102,"journal":{"name":"Property Management","volume":"34 1","pages":""},"PeriodicalIF":1.1000,"publicationDate":"2023-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Property Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/pm-02-2023-0017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose

Effective facility management (FM) can reduce environmental effects on buildings throughout their life cycle. This study aims to investigate the challenges in implementing building information modelling (BIM) for FM in government buildings in Thailand.

Design/methodology/approach

Eight government-building facility experts were interviewed using an in-depth interview method to identify FM challenges. The collected qualitative data were analysed via thematic analysis to ensure data saturation. The final questionnaire was designed with 45 FM problems, classified into management, technical and human resource problems, to collect quantitative data from 54 government FM officers. The data were used to prioritise the severity and frequency of the FM problems using the severity index (SI) and relative importance index (RII).

Findings

Management problems have the highest impact, with an average SI of 0.285, followed by human resource (average SI = 0.266) and technical (average SI = 0.264) problems.

Originality/value

This study identifies the government-building FM problems in Thailand that are critical to the development of a BIM execution plan (BEP) guideline. The findings can facilitate strategy development for government-building operations and management in line with the public procurement and supply administration of Thailand. These findings can serve as a guideline to inform the development of a BIM Roadmap for integration into the national digital roadmap and the Thailand 4.0 policy to mitigate construction-related environmental and climate issues.

在泰国政府大楼设施管理中实施建筑信息模型所面临的挑战
目的有效的设施管理(FM)可以减少建筑物在整个生命周期中对环境的影响。本研究旨在调查在泰国政府建筑中实施建筑信息模型(BIM)进行设施管理所面临的挑战。设计/方法/途径采用深度访谈法对八位政府建筑设施专家进行了访谈,以确定设施管理所面临的挑战。对收集到的定性数据进行了专题分析,以确保数据的饱和度。最后设计了 45 个财务管理问题的调查问卷,分为管理、技术和人力资源问题,以收集 54 名政府财务管理人员的定量数据。研究结果管理问题的影响最大,平均 SI 为 0.285,其次是人力资源问题(平均 SI = 0.266)和技术问题(平均 SI = 0.264)。研究结果有助于制定符合泰国公共采购和供应管理的政府建筑运营和管理战略。这些研究结果可作为制定 BIM 路线图的指南,以便将其纳入国家数字路线图和泰国 4.0 政策,从而缓解与建筑相关的环境和气候问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Property Management
Property Management MANAGEMENT-
CiteScore
2.70
自引率
20.00%
发文量
36
期刊介绍: Property Management publishes: ■Refereed papers on important current trends and reserach issues ■Digests of market reports and data ■In-depth analysis of a specific area ■Legal updates on judgments in landlord and tenant law ■Regular book and internet reviews providing an overview of the growing body of property market research
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信