Long-term maintenance optimization for integrated mining operations

IF 4.6 Q2 MATERIALS SCIENCE, BIOMATERIALS
Yingying Yang, Ryan Loxton, Andrew L. Rohl, Hoa T. Bui
{"title":"Long-term maintenance optimization for integrated mining operations","authors":"Yingying Yang, Ryan Loxton, Andrew L. Rohl, Hoa T. Bui","doi":"10.1007/s11081-023-09863-3","DOIUrl":null,"url":null,"abstract":"<p>Maintenance activities are inevitable and costly in integrated mining operations. Conducting maintenance may require the whole system, or sub-units of the system, to be shut down temporarily. These maintenance activities not only disrupt the unit being shut down, but they also have consequences for inventory levels and product flow downstream. In this paper, we consider an interconnected mining system in which there are complicated maintenance relationships and stock accumulation at intermediate nodes. We propose a time-indexed mixed-integer linear programming formulation to optimize the long-term integrated maintenance plan and maximize the total throughput. We also devise an algorithm, which combines Benders decomposition and Lagrangian relaxation, to accelerate the computational speed. To validate our mathematical model, we perform simulations for a real-world case study in the iron ore industry. The results show that our method can yield better solutions than <span>CPLEX</span> optimization solver alone in faster time.</p>","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2023-11-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1007/s11081-023-09863-3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 0

Abstract

Maintenance activities are inevitable and costly in integrated mining operations. Conducting maintenance may require the whole system, or sub-units of the system, to be shut down temporarily. These maintenance activities not only disrupt the unit being shut down, but they also have consequences for inventory levels and product flow downstream. In this paper, we consider an interconnected mining system in which there are complicated maintenance relationships and stock accumulation at intermediate nodes. We propose a time-indexed mixed-integer linear programming formulation to optimize the long-term integrated maintenance plan and maximize the total throughput. We also devise an algorithm, which combines Benders decomposition and Lagrangian relaxation, to accelerate the computational speed. To validate our mathematical model, we perform simulations for a real-world case study in the iron ore industry. The results show that our method can yield better solutions than CPLEX optimization solver alone in faster time.

Abstract Image

综合采矿作业的长期维护优化
在综合采矿作业中,维修活动是不可避免和昂贵的。进行维护可能需要整个系统或系统的子单元暂时关闭。这些维护活动不仅会破坏正在关闭的设备,而且还会对库存水平和下游的产品流产生影响。本文考虑一个具有复杂维护关系和中间节点存量积累的互联采矿系统。我们提出了一个时间索引的混合整数线性规划公式,以优化长期综合维护计划和最大化总吞吐量。我们还设计了一种结合Benders分解和拉格朗日松弛的算法来加快计算速度。为了验证我们的数学模型,我们对铁矿石行业的实际案例进行了模拟研究。结果表明,该方法比单独使用CPLEX优化求解器在更快的时间内得到更好的解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
ACS Applied Bio Materials
ACS Applied Bio Materials Chemistry-Chemistry (all)
CiteScore
9.40
自引率
2.10%
发文量
464
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信