EFFECT OF MONITORING LEVEL ON COMPLETION RATE OF DEVELOPMENT PROJECTS IN MANDERA COUNTY, KENYA

HASSAN ALI ABDIRAHMAN, GEORGE ODOUR OOKO, CHRP, PhD, CONSTANTINE NYAMBOGA MATOKE, PhD
{"title":"EFFECT OF MONITORING LEVEL ON COMPLETION RATE OF DEVELOPMENT PROJECTS IN MANDERA COUNTY, KENYA","authors":"HASSAN ALI ABDIRAHMAN, GEORGE ODOUR OOKO, CHRP, PhD, CONSTANTINE NYAMBOGA MATOKE, PhD","doi":"10.61426/sjbcm.v10i4.2792","DOIUrl":null,"url":null,"abstract":"This study aimed at assessing the effect of monitoring level on completion rate of development projects in Mandera County, Kenya. The study adopted a descriptive survey design . 160 respondents were targeted and sample size of 113 was chosen using Krejcie and Morgan (1970) method. Questionnaire was used to collect data from respondents in seven departments in County Government of Mandera. Pilot study was conducted on 8 respondents in Mandera West Sub County hence these respondents were not included during data collection. Descriptive and inferential statistics was used to analyze data by use of mean, percentages, correlation and regression coefficients. Data was analyzed using SPSS and presented using frequency distribution tables and figures. Researcher maintained ethical consideration by obtaining research permits from the University, County Government of Mandera and Kenyan Government through NACOSTI. The study monitoring level had a significant and positive effect on completion rate of development projects (beta value of 0.129). The study concluded that county government of Mandera need to monitor the progress level of development projects in order to identify if there is any gap to be rectified. The gaps can be in term of resource constraints which when mobilized can increase the completion rate of development projects in Mandera County, Kenya. Keywords: Completion Rate, Development Projects and Monitoring Level CITATION : Abdirahman, H. A., & Ooko, G. O., & Matoke, C. N. (2023). Effect of monitoring level on completion rate of development projects in Mandera County, Kenya. The Strategic Journal of Business & Change Management, 10 (4), 979 – 984. http://dx.doi.org/10.61426/sjbcm.v10i4.2792","PeriodicalId":22086,"journal":{"name":"Strategic Journal of Business & Change Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Strategic Journal of Business & Change Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.61426/sjbcm.v10i4.2792","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study aimed at assessing the effect of monitoring level on completion rate of development projects in Mandera County, Kenya. The study adopted a descriptive survey design . 160 respondents were targeted and sample size of 113 was chosen using Krejcie and Morgan (1970) method. Questionnaire was used to collect data from respondents in seven departments in County Government of Mandera. Pilot study was conducted on 8 respondents in Mandera West Sub County hence these respondents were not included during data collection. Descriptive and inferential statistics was used to analyze data by use of mean, percentages, correlation and regression coefficients. Data was analyzed using SPSS and presented using frequency distribution tables and figures. Researcher maintained ethical consideration by obtaining research permits from the University, County Government of Mandera and Kenyan Government through NACOSTI. The study monitoring level had a significant and positive effect on completion rate of development projects (beta value of 0.129). The study concluded that county government of Mandera need to monitor the progress level of development projects in order to identify if there is any gap to be rectified. The gaps can be in term of resource constraints which when mobilized can increase the completion rate of development projects in Mandera County, Kenya. Keywords: Completion Rate, Development Projects and Monitoring Level CITATION : Abdirahman, H. A., & Ooko, G. O., & Matoke, C. N. (2023). Effect of monitoring level on completion rate of development projects in Mandera County, Kenya. The Strategic Journal of Business & Change Management, 10 (4), 979 – 984. http://dx.doi.org/10.61426/sjbcm.v10i4.2792
监测水平对肯尼亚曼德拉县发展项目完成率的影响
本研究旨在评估监测水平对肯尼亚曼德拉县发展项目完成率的影响。本研究采用描述性调查设计。采用Krejcie和Morgan(1970)的方法,调查对象为160人,样本量为113人。采用问卷法对曼德拉县政府七个部门的受访者进行数据收集。对曼德拉西副县的8名受访者进行了试点研究,因此这些受访者未包括在数据收集过程中。采用描述性统计和推理统计,采用均值、百分比、相关和回归系数对数据进行分析。数据采用SPSS统计软件进行分析,并采用频率分布表格和图表进行呈现。研究人员通过NACOSTI获得了大学、曼德拉县政府和肯尼亚政府的研究许可,从而保持了伦理考虑。研究监测水平对开发项目完成率有显著的正向影响(beta值为0.129)。该研究的结论是,曼德拉县政府需要监测发展项目的进展水平,以确定是否有任何差距需要纠正。这种差距可能是由于资源限制造成的,如果调动起来,可以提高肯尼亚曼德拉县发展项目的完成率。关键词:完成率,开发项目,监测水平引文:Abdirahman, H. A.,等;Ooko, G. O. &马托克,c.n.(2023)。监测水平对肯尼亚曼德拉县发展项目完成率的影响。商业战略杂志;管理学报,10(4),979 - 984。http://dx.doi.org/10.61426/sjbcm.v10i4.2792
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信