{"title":"The failure factors of the contracting business from the contractors point of view","authors":"Ibrahim Mahamid","doi":"10.1556/1848.2023.00707","DOIUrl":null,"url":null,"abstract":"Abstract This article aims at illustrating the major factors of construction firms' failure from the perspective of constructors. Thirty-seven (37) factors are illustrated in this article. The factors are divided under 3 groups: financial, managerial and external. The study used the field survey technique (questionnaire) to collect the necessary data that serves its purpose. Results illustrate that the top 5 contributors are: delay in collecting payments from owner (financial group), poor work experience (managerial group), bidding strategy (managerial group), local political conditions, low profit due to high competition (financial group). Results indicate that the top factors are internal factors which could be handled and controlled by the company itself. The results of this study are the first step towards identifying the problems of contracting companies in order to understand them and try to find solutions that will raise the level of companies and ensure their continuity and success.","PeriodicalId":37508,"journal":{"name":"International Review of Applied Sciences and Engineering","volume":"54 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Review of Applied Sciences and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1556/1848.2023.00707","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0
Abstract
Abstract This article aims at illustrating the major factors of construction firms' failure from the perspective of constructors. Thirty-seven (37) factors are illustrated in this article. The factors are divided under 3 groups: financial, managerial and external. The study used the field survey technique (questionnaire) to collect the necessary data that serves its purpose. Results illustrate that the top 5 contributors are: delay in collecting payments from owner (financial group), poor work experience (managerial group), bidding strategy (managerial group), local political conditions, low profit due to high competition (financial group). Results indicate that the top factors are internal factors which could be handled and controlled by the company itself. The results of this study are the first step towards identifying the problems of contracting companies in order to understand them and try to find solutions that will raise the level of companies and ensure their continuity and success.
期刊介绍:
International Review of Applied Sciences and Engineering is a peer reviewed journal. It offers a comprehensive range of articles on all aspects of engineering and applied sciences. It provides an international and interdisciplinary platform for the exchange of ideas between engineers, researchers and scholars within the academy and industry. It covers a wide range of application areas including architecture, building services and energetics, civil engineering, electrical engineering and mechatronics, environmental engineering, mechanical engineering, material sciences, applied informatics and management sciences. The aim of the Journal is to provide a location for reporting original research results having international focus with multidisciplinary content. The published papers provide solely new basic information for designers, scholars and developers working in the mentioned fields. The papers reflect the broad categories of interest in: optimisation, simulation, modelling, control techniques, monitoring, and development of new analysis methods, equipment and system conception.