Budget Optimalization using ISO 31000 Risk Assessment Method

Q2 Engineering
{"title":"Budget Optimalization using ISO 31000 Risk Assessment Method","authors":"","doi":"10.30534/ijeter/2023/0511112023","DOIUrl":null,"url":null,"abstract":"Cost is always associated with complexity and risk. Project that has high complexity increases the associated risks along with the costs. The article takes case study of a state-owned energy company, XYZ that builds electricity transmission projects around Indonesia. Transmission project has high complexity since it involves various expertise of contractors and subcontractors. Using subcontractors in a transmission project is a common thing and it poses many risks associated with the chain of contractors and her subcontractors. Indonesia is surrounded with variety of topology such as forests, mountains, rural areas, and islands, has variety of risks associated with them. The article proposes the use of ISO 31000 risk assessment method to identify dan mitigate all possible risks along with further budgeting policy. Budgeting policy is needed to assist the project owner to assess the scope of work of each work-breakdown task within the chain of contractors/subcontractors. By learning all costs within each task, project owner can develop effective cost measures that can be applied in various project conditions.","PeriodicalId":13964,"journal":{"name":"International Journal of Emerging Trends in Engineering Research","volume":" 27","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Emerging Trends in Engineering Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30534/ijeter/2023/0511112023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

Cost is always associated with complexity and risk. Project that has high complexity increases the associated risks along with the costs. The article takes case study of a state-owned energy company, XYZ that builds electricity transmission projects around Indonesia. Transmission project has high complexity since it involves various expertise of contractors and subcontractors. Using subcontractors in a transmission project is a common thing and it poses many risks associated with the chain of contractors and her subcontractors. Indonesia is surrounded with variety of topology such as forests, mountains, rural areas, and islands, has variety of risks associated with them. The article proposes the use of ISO 31000 risk assessment method to identify dan mitigate all possible risks along with further budgeting policy. Budgeting policy is needed to assist the project owner to assess the scope of work of each work-breakdown task within the chain of contractors/subcontractors. By learning all costs within each task, project owner can develop effective cost measures that can be applied in various project conditions.
运用ISO 31000风险评估方法进行预算优化
成本总是与复杂性和风险联系在一起。具有高复杂性的项目会增加相关的风险和成本。本文以在印尼各地建设输电项目的国有能源公司XYZ为例进行了研究。输变电工程涉及承包商和分包商的各种专业知识,具有较高的复杂性。在输电工程中使用分包商是一件常见的事情,它带来了与承包商及其分包商链相关的许多风险。印度尼西亚被各种各样的拓扑结构所包围,如森林、山脉、农村地区和岛屿,与之相关的风险也多种多样。本文建议使用ISO 31000风险评估方法来识别和减轻所有可能的风险以及进一步的预算政策。需要预算政策来协助项目业主评估承包商/分包商链中每个工作分解任务的工作范围。通过了解每个任务中的所有成本,项目所有者可以制定有效的成本措施,可以在各种项目条件下应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
70
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信