Controlled operation of GP-200/11x500-m pump

Q4 Engineering
O.I. Brazhnik
{"title":"Controlled operation of GP-200/11x500-m pump","authors":"O.I. Brazhnik","doi":"10.30686/1609-9192-2023-4-33-34","DOIUrl":null,"url":null,"abstract":"The article analyzes the results of pilot tests of the GP-200/11x500-m pump in conditions of evacuating large-scale mineralized water inflows from the Udachny Underground Mine named after Fyodor Andreev. It provides information on the operating time of the pump components obtained by empirical method during the controlled operation over 5500 service hours. The data on economic efficiency of the GP-200/11x500-m pump utilization are updated and specific financial indicators are compared with the previously used equipment.","PeriodicalId":36119,"journal":{"name":"Gornaya Promyshlennost","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gornaya Promyshlennost","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2023-4-33-34","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

The article analyzes the results of pilot tests of the GP-200/11x500-m pump in conditions of evacuating large-scale mineralized water inflows from the Udachny Underground Mine named after Fyodor Andreev. It provides information on the operating time of the pump components obtained by empirical method during the controlled operation over 5500 service hours. The data on economic efficiency of the GP-200/11x500-m pump utilization are updated and specific financial indicators are compared with the previously used equipment.
GP-200/11x500-m泵控制运行
本文分析了GP-200/11x500-m泵在抽排费奥多尔·安德烈耶夫(Fyodor Andreev)乌达奇尼(Udachny)地下矿大规模涌水条件下的中试结果。它提供了在5500多个服务小时的受控运行期间,通过经验方法获得的泵部件运行时间的信息。更新了GP-200/11x500-m泵利用的经济效益数据,并与之前使用的设备进行了具体财务指标的比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Gornaya Promyshlennost
Gornaya Promyshlennost Engineering-Industrial and Manufacturing Engineering
CiteScore
1.10
自引率
0.00%
发文量
100
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信