Revitalisasi Pecinan di Siak Sri Indrapura Sri Indrapura Spasca Kebakaran (2018-2022)

Q1 Arts and Humanities
Muhammad Ikhsan Fauzana, Erniwati Erniwati
{"title":"Revitalisasi Pecinan di Siak Sri Indrapura Sri Indrapura Spasca Kebakaran (2018-2022)","authors":"Muhammad Ikhsan Fauzana, Erniwati Erniwati","doi":"10.58578/ahkam.v2i4.2103","DOIUrl":null,"url":null,"abstract":"This research discusses efforts to revitalize Chinatown in Siak Sri Indrapura after the fire that occurred on February 17 2018 coincided with Chinese New Year celebrations. In this fire tragedy, 54 houses burned down with losses estimated at 15 billion. Until now, efforts to revitalize a number of burned buildings have not yet been implemented. Due to the slow pace of revitalization efforts, quite a few Chinese people affected by the fire chose to build new business premises and residences. This will of course have a big impact on the development of socio-economic life as well as an impact on the tourism sector which is being worked on by the Siak Sri Indrapura Regency government. The aim of this research is to answer questions related to the revitalization of Chinatown in Siak Sri Indrapura which has never been completed. In this case the author uses a historical research method which consists of four stages consisting of Heuristics, Interpretation, Source Criticism, Historiography. The results of this research show that the delay in Chinatown revitalization in Siak Sri Indrapura is caused by various interrelated factors, some of which are limited financial resources, stakeholder disagreements, severe building damage, permits and regulations, community involvement, changes in priorities, political uncertainty. and economics, planning and management deficiencies, and technical and architectural difficulties.","PeriodicalId":32685,"journal":{"name":"Ahkam Jurnal Ilmu Syariah","volume":"46 41","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ahkam Jurnal Ilmu Syariah","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.58578/ahkam.v2i4.2103","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Arts and Humanities","Score":null,"Total":0}
引用次数: 0

Abstract

This research discusses efforts to revitalize Chinatown in Siak Sri Indrapura after the fire that occurred on February 17 2018 coincided with Chinese New Year celebrations. In this fire tragedy, 54 houses burned down with losses estimated at 15 billion. Until now, efforts to revitalize a number of burned buildings have not yet been implemented. Due to the slow pace of revitalization efforts, quite a few Chinese people affected by the fire chose to build new business premises and residences. This will of course have a big impact on the development of socio-economic life as well as an impact on the tourism sector which is being worked on by the Siak Sri Indrapura Regency government. The aim of this research is to answer questions related to the revitalization of Chinatown in Siak Sri Indrapura which has never been completed. In this case the author uses a historical research method which consists of four stages consisting of Heuristics, Interpretation, Source Criticism, Historiography. The results of this research show that the delay in Chinatown revitalization in Siak Sri Indrapura is caused by various interrelated factors, some of which are limited financial resources, stakeholder disagreements, severe building damage, permits and regulations, community involvement, changes in priorities, political uncertainty. and economics, planning and management deficiencies, and technical and architectural difficulties.
振兴锡耶克斯里印德拉布拉斯里印德拉布拉斯帕斯卡唐人街火灾(2018-2022 年)
本研究讨论了在2018年2月17日与中国新年庆祝活动同时发生的火灾发生后,锡亚克斯里因德拉普拉唐人街的复兴努力。在这场火灾悲剧中,54所房屋被烧毁,损失估计为150亿美元。到目前为止,一些被烧毁的建筑物的恢复工作尚未实施。由于重建工作进展缓慢,不少受火灾影响的中国人选择建造新的商业场所和住宅。这当然会对社会经济生活的发展产生重大影响,同时也会对旅游业产生重大影响,而这正是西雅斯里因德拉普拉县政府所致力的。本研究的目的是回答有关西雅斯里因德拉普拉唐人街的振兴问题,这一问题从未完成。本文采用了启发式、阐释、源批判、史学四个阶段的历史研究方法。本研究结果显示,锡亚Sri Indrapura的唐人街复兴延迟是由多种相互关联的因素造成的,其中一些因素是有限的财政资源,利益相关者的分歧,严重的建筑损坏,许可和法规,社区参与,优先事项的变化,政治不确定性。以及经济、规划和管理方面的不足,以及技术和架构方面的困难。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Ahkam Jurnal Ilmu Syariah
Ahkam Jurnal Ilmu Syariah Arts and Humanities-Religious Studies
CiteScore
3.30
自引率
0.00%
发文量
0
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信