Pilot project to estimate the centralized volt/VAr control effectiveness

I. Roytelman, B. K. Wee, R. Lugtu, T. Kulas, T. Brossart
{"title":"Pilot project to estimate the centralized volt/VAr control effectiveness","authors":"I. Roytelman, B. K. Wee, R. Lugtu, T. Kulas, T. Brossart","doi":"10.1109/PICA.1997.599423","DOIUrl":null,"url":null,"abstract":"This paper describes a volt/VAr control (VVC) project in which a centralized network-model based VVC was put in place to control a 13.8 kV distribution subsystem. The goal of the project is to estimate the effectiveness of VVC based on different objective functions, including an objective function for future market economy (revenue maximization). The technical issues which are critical to implementing the VVC are discussed. The effectiveness of VVC for energy conservation and revenue maximization is calculated as an effect due to the immediate (within the span of a few minutes) load to voltage response. This effect is compared with the actual effect calculated based on a fifteen minutes average archived telemetered data.","PeriodicalId":383749,"journal":{"name":"Proceedings of the 20th International Conference on Power Industry Computer Applications","volume":"77 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"39","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 20th International Conference on Power Industry Computer Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1997.599423","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 39

Abstract

This paper describes a volt/VAr control (VVC) project in which a centralized network-model based VVC was put in place to control a 13.8 kV distribution subsystem. The goal of the project is to estimate the effectiveness of VVC based on different objective functions, including an objective function for future market economy (revenue maximization). The technical issues which are critical to implementing the VVC are discussed. The effectiveness of VVC for energy conservation and revenue maximization is calculated as an effect due to the immediate (within the span of a few minutes) load to voltage response. This effect is compared with the actual effect calculated based on a fifteen minutes average archived telemetered data.
试点项目,以评估集中电压/VAr控制效果
本文介绍了一种电压/无功控制(VVC)方案,该方案采用基于集中式网络模型的VVC控制13.8 kV配电分系统。该项目的目标是基于不同的目标函数来估计VVC的有效性,包括未来市场经济的目标函数(收益最大化)。讨论了实现VVC的关键技术问题。VVC对节能和收益最大化的有效性被计算为由于立即(在几分钟内)负载对电压响应的影响。将此效果与基于15分钟平均存档遥测数据计算的实际效果进行比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信