Transmit the light fantastic [HVDC power transmission]

Power Engineer Pub Date : 2006-06-05 DOI:10.1049/PE:20060204
C. Ashmore
{"title":"Transmit the light fantastic [HVDC power transmission]","authors":"C. Ashmore","doi":"10.1049/PE:20060204","DOIUrl":null,"url":null,"abstract":"This paper looks at the current state of the electrical energy sector in the People's Republic of China in the face of a massive rate of economic growth. More than 120 GW of generating capacity is under construction including the 18.2 GW Three Gorges hydroelectric project, which is due for eventual expansion to 22.4 GW. However, even with this rate of growth within the electrical energy sector, new generating capacity is unlikely to meet demand in most areas for at least another 12 months. Despite efforts to reform the electricity sector, strengthening the country's power grid networks remains a key objective. Fortunately, the pace of technological development in the power transmission sector is also gathering momentum. Awaiting approval is a project to construct the world's first ultra high voltage direct current (UHVDC) transmission system. This is part of the effort to upgrade and reinforce the existing nine west-to-east links which import bulk power.","PeriodicalId":182274,"journal":{"name":"Power Engineer","volume":"339 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power Engineer","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/PE:20060204","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

Abstract

This paper looks at the current state of the electrical energy sector in the People's Republic of China in the face of a massive rate of economic growth. More than 120 GW of generating capacity is under construction including the 18.2 GW Three Gorges hydroelectric project, which is due for eventual expansion to 22.4 GW. However, even with this rate of growth within the electrical energy sector, new generating capacity is unlikely to meet demand in most areas for at least another 12 months. Despite efforts to reform the electricity sector, strengthening the country's power grid networks remains a key objective. Fortunately, the pace of technological development in the power transmission sector is also gathering momentum. Awaiting approval is a project to construct the world's first ultra high voltage direct current (UHVDC) transmission system. This is part of the effort to upgrade and reinforce the existing nine west-to-east links which import bulk power.
传光神奇【高压直流输电】
本文着眼于中国电力能源部门在面对巨大的经济增长速度的现状。超过120吉瓦的发电能力正在建设中,其中包括18.2吉瓦的三峡水电项目,该项目最终将扩大到22.4吉瓦。然而,即使在电力能源部门的这种增长速度下,至少在未来12个月内,新的发电能力也不太可能满足大多数地区的需求。尽管努力改革电力部门,但加强国家电网网络仍然是一个关键目标。幸运的是,电力传输领域的技术发展步伐也在加快。等待批准的是建设世界上第一个特高压直流输电系统的项目。这是升级和加强现有的9条进口大量电力的西电东线的努力的一部分。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信