Generating low cost plans under uncertainty and temporal constraints

B. Baki, M. Bouzid, A. Ligeza
{"title":"Generating low cost plans under uncertainty and temporal constraints","authors":"B. Baki, M. Bouzid, A. Ligeza","doi":"10.1109/ICTAI.2005.68","DOIUrl":null,"url":null,"abstract":"The paper describes a new approach to generating partially ordered plans with durative actions. Both cost and duration of any task is defined through probability distribution. We propose a planner that generates a plan represented in the form of a partially ordered set of tasks. Each task has a set of temporal constraints, a set of probabilities and a set of constant costs. The planning system generates admissible plans satisfying temporal constraints and allows to select the plan of lowest expected cost","PeriodicalId":294694,"journal":{"name":"17th IEEE International Conference on Tools with Artificial Intelligence (ICTAI'05)","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-11-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"17th IEEE International Conference on Tools with Artificial Intelligence (ICTAI'05)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICTAI.2005.68","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The paper describes a new approach to generating partially ordered plans with durative actions. Both cost and duration of any task is defined through probability distribution. We propose a planner that generates a plan represented in the form of a partially ordered set of tasks. Each task has a set of temporal constraints, a set of probabilities and a set of constant costs. The planning system generates admissible plans satisfying temporal constraints and allows to select the plan of lowest expected cost
在不确定性和时间限制下生成低成本计划
本文描述了一种生成具有持续动作的部分有序计划的新方法。任何任务的成本和持续时间都是通过概率分布来定义的。我们提出了一个计划器,它生成一个以部分有序任务集的形式表示的计划。每个任务都有一组时间限制、一组概率和一组恒定成本。规划系统生成满足时间约束的可接受方案,并允许选择期望成本最低的方案
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信