{"title":"Reconciling high-speed scheduling with dispatching in wafer fabs","authors":"M. Johnston","doi":"10.1109/ISSM.2001.962926","DOIUrl":null,"url":null,"abstract":"A novel approach to reconciling global optimizing scheduling with real-time dispatching is presented. High speed scheduling is accomplished by two simultaneous cooperating scheduling processes, one of which generates longer term schedules while the other is focused with higher resolution on the nearer term. Real-time dispatching is based on the most recently generated near term schedule, carefully reconciled with events that could affect its current validity on the shopfloor. Results are presented which show a fivefold performance speedup in schedule generation time, as well as significant schedule quality improvements over pure dispatching approaches.","PeriodicalId":356225,"journal":{"name":"2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203)","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-10-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSM.2001.962926","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
A novel approach to reconciling global optimizing scheduling with real-time dispatching is presented. High speed scheduling is accomplished by two simultaneous cooperating scheduling processes, one of which generates longer term schedules while the other is focused with higher resolution on the nearer term. Real-time dispatching is based on the most recently generated near term schedule, carefully reconciled with events that could affect its current validity on the shopfloor. Results are presented which show a fivefold performance speedup in schedule generation time, as well as significant schedule quality improvements over pure dispatching approaches.