A Proposed Data Preprocessing Method for an Industrial Prediction Process

Ilham Battas, Ridouane Oulhiq, Hicham Behja, L. Deshayes
{"title":"A Proposed Data Preprocessing Method for an Industrial Prediction Process","authors":"Ilham Battas, Ridouane Oulhiq, Hicham Behja, L. Deshayes","doi":"10.1109/CiSt49399.2021.9357269","DOIUrl":null,"url":null,"abstract":"The studied mining production chain generally divided into three principal units: Destoning, screening and loading. The role of the screening unit is to screen the phosphate produced by the destoning unit before the loading to trains. Its efficiency depends on several parameters, which makes analysis and decision making for its improvement very complicated. The purpose of this paper is to propose a prediction system to evaluate and monitor in advance the efficiency of the screening unit. This system is based on Knowledge discovery in databases that comprises generally three steps: data pre-processing, development of prediction models and finally validation and verification of the proposed models. The first consists in having in-depth information and knowledge about the application domain, in order to determine the set of parameters influencing the efficiency and to pre-process the data of the these parameters, in order to improve their quality before being used by the second step, which aims to develop predictive models that will be validated and verified with different evaluation criteria during the last step. This work focuses on the first level of development of the system in question, data pre-processing, which has been applied to the mine's screening unit facilities, and the results of this case study are also presented.","PeriodicalId":253233,"journal":{"name":"2020 6th IEEE Congress on Information Science and Technology (CiSt)","volume":"201 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 6th IEEE Congress on Information Science and Technology (CiSt)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CiSt49399.2021.9357269","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The studied mining production chain generally divided into three principal units: Destoning, screening and loading. The role of the screening unit is to screen the phosphate produced by the destoning unit before the loading to trains. Its efficiency depends on several parameters, which makes analysis and decision making for its improvement very complicated. The purpose of this paper is to propose a prediction system to evaluate and monitor in advance the efficiency of the screening unit. This system is based on Knowledge discovery in databases that comprises generally three steps: data pre-processing, development of prediction models and finally validation and verification of the proposed models. The first consists in having in-depth information and knowledge about the application domain, in order to determine the set of parameters influencing the efficiency and to pre-process the data of the these parameters, in order to improve their quality before being used by the second step, which aims to develop predictive models that will be validated and verified with different evaluation criteria during the last step. This work focuses on the first level of development of the system in question, data pre-processing, which has been applied to the mine's screening unit facilities, and the results of this case study are also presented.
一种工业预测过程的数据预处理方法
所研究的采矿生产链一般分为三个主要单元:选石、筛分和装载。筛分装置的作用是在装车前对脱石装置产生的磷酸盐进行筛分。它的效率取决于几个参数,这使得对其改进的分析和决策非常复杂。本文的目的是提出一个预测系统,以提前评估和监测筛选单元的效率。该系统基于数据库中的知识发现,一般包括三个步骤:数据预处理,开发预测模型,最后验证和验证所提出的模型。第一步是深入了解应用领域的信息和知识,以确定影响效率的一组参数,并对这些参数的数据进行预处理,以提高其质量,然后再用于第二步。第二步的目的是建立预测模型,并在最后一步中使用不同的评估标准进行验证和验证。这项工作的重点是该系统的第一阶段开发,即数据预处理,该技术已应用于矿山的筛选单元设施,并介绍了该案例研究的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信