{"title":"Case comment: Judgment of the Court of 15 September 2016 PGE Górnictwo i Energetyka Konwencjonalna SA v Energy Regulatory Office","authors":"A. Maziarz","doi":"10.21697/PRIEL.2017.6.1.04","DOIUrl":null,"url":null,"abstract":"The case deals with the problem of the division of powers as well as state aid law in relation to the issue of compensation schemes for the termination of long-term contracts in the electricity sector. Moreover, the case faces the problem of interpretation of the scope of the adjustment of state aid.","PeriodicalId":269602,"journal":{"name":"Polish Review of International and European Law","volume":"253 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Polish Review of International and European Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21697/PRIEL.2017.6.1.04","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The case deals with the problem of the division of powers as well as state aid law in relation to the issue of compensation schemes for the termination of long-term contracts in the electricity sector. Moreover, the case faces the problem of interpretation of the scope of the adjustment of state aid.