{"title":"Research on Integrated Scheduling Algorithm of Inbound and Depart Flights in Airport Based on Integrated Operation","authors":"Q. Zhuang, Ke Deng, Xinxin Ye","doi":"10.1145/3448734.3450827","DOIUrl":null,"url":null,"abstract":"In the past decade, with the development of economy, flight traffic flow is increasing, and the phenomenon of flight congestion and delay is increasing. The departure command and approach command lack of efficient linkage and coordination, the tower and approach determine the insertion and release intervals and time slots through manual coordination communication. The time slot resource interval cannot be fully used, so it is urgent to study a set of integrated flight scheduling algorithm based on integrated operation to improve the scene operation efficiency. From the perspective of process management system construction, this paper describes the construction background, construction content, technical innovation and existing problems of the project. The research results effectively promote the research progress in this field in China and lay a foundation for practical operation.","PeriodicalId":105999,"journal":{"name":"The 2nd International Conference on Computing and Data Science","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-01-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The 2nd International Conference on Computing and Data Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3448734.3450827","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In the past decade, with the development of economy, flight traffic flow is increasing, and the phenomenon of flight congestion and delay is increasing. The departure command and approach command lack of efficient linkage and coordination, the tower and approach determine the insertion and release intervals and time slots through manual coordination communication. The time slot resource interval cannot be fully used, so it is urgent to study a set of integrated flight scheduling algorithm based on integrated operation to improve the scene operation efficiency. From the perspective of process management system construction, this paper describes the construction background, construction content, technical innovation and existing problems of the project. The research results effectively promote the research progress in this field in China and lay a foundation for practical operation.