Improving hardware, software, and training deployment processes

J. A. Forbes, E. Baker
{"title":"Improving hardware, software, and training deployment processes","authors":"J. A. Forbes, E. Baker","doi":"10.1109/ICSM.2003.1235446","DOIUrl":null,"url":null,"abstract":"In this study, we reviewed the deployment practices of selected PEO-STAMIS (Program Executive Office − Standard Management Information System) product managers to better understand the state of the practice within the portfolio of the program executive office. To understand the state of the art in industry and provide a basis of comparison, we examined the practices of government and commercial organizations, with emphasis on identifying best practices that could be utilized by any type of organization, government or commercial, to facilitate the transition to operations and maintenance. The primary results of this study were the development of a \"maturity model\" of the deployment process and a prioritized set of best practices culled from those in use by government and commercial organizations. This paper discusses the deployment \"maturity\" model and the best practices.","PeriodicalId":141256,"journal":{"name":"International Conference on Software Maintenance, 2003. ICSM 2003. Proceedings.","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-09-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Software Maintenance, 2003. ICSM 2003. Proceedings.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSM.2003.1235446","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In this study, we reviewed the deployment practices of selected PEO-STAMIS (Program Executive Office − Standard Management Information System) product managers to better understand the state of the practice within the portfolio of the program executive office. To understand the state of the art in industry and provide a basis of comparison, we examined the practices of government and commercial organizations, with emphasis on identifying best practices that could be utilized by any type of organization, government or commercial, to facilitate the transition to operations and maintenance. The primary results of this study were the development of a "maturity model" of the deployment process and a prioritized set of best practices culled from those in use by government and commercial organizations. This paper discusses the deployment "maturity" model and the best practices.
改进硬件、软件和培训部署流程
在本研究中,我们回顾了选定的PEO-STAMIS(项目执行办公室-标准管理信息系统)产品经理的部署实践,以更好地了解项目执行办公室投资组合中的实践状态。为了了解行业的现状并提供一个比较的基础,我们研究了政府和商业组织的实践,重点是确定任何类型的组织(政府或商业)都可以利用的最佳实践,以促进向运营和维护的过渡。这项研究的主要结果是开发了部署过程的“成熟度模型”,以及从政府和商业组织使用的最佳实践中挑选出的优先级最佳实践集。本文讨论了部署“成熟度”模型和最佳实践。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信