{"title":"Analysis on Influencing Factors of Repair Order of Power Supply Station based on Grey Correlation Analysis","authors":"Jiyang Lu, Jun Ji, Xiangwei Xu","doi":"10.1109/AEEES54426.2022.9759700","DOIUrl":null,"url":null,"abstract":"This paper introduces the research status of work order processing means in power supply substation, and points out that the current research focuses on using work order system to solve actual production problems, ignoring the analysis of the influencing factors of work order quantity. Therefore, this paper puts forward the analysis framework of the correlation degree between the work order of the power supply station and external factors, establishes the influencing factor analysis model based on the grey correlation method, and carries out the analysis from the medium and long-term time scale. The conclusions can be used for reference in practical production.","PeriodicalId":252797,"journal":{"name":"2022 4th Asia Energy and Electrical Engineering Symposium (AEEES)","volume":"104 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 4th Asia Energy and Electrical Engineering Symposium (AEEES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AEEES54426.2022.9759700","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper introduces the research status of work order processing means in power supply substation, and points out that the current research focuses on using work order system to solve actual production problems, ignoring the analysis of the influencing factors of work order quantity. Therefore, this paper puts forward the analysis framework of the correlation degree between the work order of the power supply station and external factors, establishes the influencing factor analysis model based on the grey correlation method, and carries out the analysis from the medium and long-term time scale. The conclusions can be used for reference in practical production.
基于灰色关联分析的供电站检修顺序影响因素分析
介绍了供电所工单处理手段的研究现状,指出目前的研究侧重于利用工单系统解决实际生产问题,忽略了对工单数量影响因素的分析。为此,本文提出了供电站工作秩序与外部因素关联度的分析框架,建立了基于灰色关联法的影响因素分析模型,并从中长期时间尺度进行分析。所得结论可为实际生产提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信