{"title":"Electrical Equipment Design Considerations for Now and the Future","authors":"R. Paes, Jitendra Bharthi, J. Flores","doi":"10.23919/pciceurope50407.2021.9805430","DOIUrl":null,"url":null,"abstract":"There are many stakeholders involved in a project. A number of these are well known and have always been the key participants, however, with the broader scope associated with projects such as greater integration than ever before, new parties should now be considered as members of the project team; members that have taken a more passive or disconnected role previously.","PeriodicalId":207591,"journal":{"name":"2021 Petroleum and Chemical Industry Conference Europe (PCIC Europe)","volume":"89 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 Petroleum and Chemical Industry Conference Europe (PCIC Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/pciceurope50407.2021.9805430","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
There are many stakeholders involved in a project. A number of these are well known and have always been the key participants, however, with the broader scope associated with projects such as greater integration than ever before, new parties should now be considered as members of the project team; members that have taken a more passive or disconnected role previously.