Contractual Issues for Hydropower Construction in Nepal

A. Neupane
{"title":"Contractual Issues for Hydropower Construction in Nepal","authors":"A. Neupane","doi":"10.3126/hn.v23i0.20826","DOIUrl":null,"url":null,"abstract":"Nepal is located at the foot of the Himalayas and has numerous perennial rivers flowing from North to South, making it an ideal place for production of massive scale of hydropower. Hence, there are many hydropower projects in construction phase, but they are facing several contractual issues such as, contractual inefficacy of the parties, payment problems, Force Majeure and claims handling mechanism. In order to build the capacity of existing contract personnel working in various projects, it is high time for the stakeholders of Nepalese construction industry to train their human resources to the required standard, such that they can properly prepare, assess and handle the contractual issues that may arise, in the international standard. HYDRO Nepal JournalJournal of Water, Energy and Environment Issue: 23Year: 2018","PeriodicalId":137822,"journal":{"name":"Hydro Nepal: Journal of Water, Energy and Environment","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydro Nepal: Journal of Water, Energy and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/hn.v23i0.20826","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Nepal is located at the foot of the Himalayas and has numerous perennial rivers flowing from North to South, making it an ideal place for production of massive scale of hydropower. Hence, there are many hydropower projects in construction phase, but they are facing several contractual issues such as, contractual inefficacy of the parties, payment problems, Force Majeure and claims handling mechanism. In order to build the capacity of existing contract personnel working in various projects, it is high time for the stakeholders of Nepalese construction industry to train their human resources to the required standard, such that they can properly prepare, assess and handle the contractual issues that may arise, in the international standard. HYDRO Nepal JournalJournal of Water, Energy and Environment Issue: 23Year: 2018
尼泊尔水电建设合同问题
尼泊尔位于喜马拉雅山脚下,有许多从北向南的多年生河流,使其成为生产大规模水电的理想场所。因此,建设阶段的水电项目很多,但都面临着合同无效、付款问题、不可抗力、索赔处理机制等合同问题。为了提高在各种项目中工作的现有合同人员的能力,尼泊尔建筑业的利益相关者应该对他们的人力资源进行必要的培训,使他们能够按照国际标准正确地准备、评估和处理可能出现的合同问题。HYDRO Nepal journal of Water, Energy and Environment Issue: 23Year: 2018
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信