{"title":"Pumped Storage Case Study in Uruguay: Simulation and Value","authors":"Federico Sanz, J. Cataldo, R. Chaer","doi":"10.1109/TDLA47668.2020.9326190","DOIUrl":null,"url":null,"abstract":"An hypothetical 220 MW pumped storage power plant to be incorporated in Uruguayan grid was considered. System operation modelling and an operation along 20-year simulation in order to estimate whole system supply cost savings was made applying the SimSEE tool. As outstanding results total cost much lower than the estimated without the system and some of projects main specifications should change in order to make it economically feasible. In addition, to have a better visualization how this technology might operate, simulations where run for several random weeks, including one during 2020 pandemic period.","PeriodicalId":448644,"journal":{"name":"2020 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D LA)","volume":"65 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDLA47668.2020.9326190","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

An hypothetical 220 MW pumped storage power plant to be incorporated in Uruguayan grid was considered. System operation modelling and an operation along 20-year simulation in order to estimate whole system supply cost savings was made applying the SimSEE tool. As outstanding results total cost much lower than the estimated without the system and some of projects main specifications should change in order to make it economically feasible. In addition, to have a better visualization how this technology might operate, simulations where run for several random weeks, including one during 2020 pandemic period.
乌拉圭抽水蓄能案例研究:模拟与价值
考虑将220兆瓦抽水蓄能电站并入乌拉圭电网。应用SimSEE工具建立了系统运行模型,并进行了为期20年的运行模拟,以估计整个系统的供应成本节约。由于结果突出,总成本远低于没有该系统的估计,而且一些项目的主要规格应改变,以使其在经济上可行。此外,为了更好地了解这项技术的运作方式,模拟随机运行了几个星期,包括2020年大流行期间的一个星期。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信