Analysis of economical service period for power transformers

B. Cahyono, T. Takahashi, T. Okamoto, Suwarno, N. Hariyanto
{"title":"Analysis of economical service period for power transformers","authors":"B. Cahyono, T. Takahashi, T. Okamoto, Suwarno, N. Hariyanto","doi":"10.1109/ICPERE.2012.6287222","DOIUrl":null,"url":null,"abstract":"Making good balance between power demand growth-and power equipment installation is one of important issues of electric power companies. Appropriate strategies of managing existing power equipment and reinforcement are necessary for obtaining the maximum quality of electricity supply with the optimum energy cost. Strategies for the existing equipment include maintenance and replacement planning. In this article, a method to evaluate average annual cost for maintaining a transformer is introduced based on real failure data of transformers. Using the method, an economical service period of transformers can be eventually estimated. Cost analysis includes transformer's initial cost, maintenance cost, and cost in the event of failure. Analysis is performed using statistical data from PT. PLN Indonesia.","PeriodicalId":303729,"journal":{"name":"2012 International Conference on Power Engineering and Renewable Energy (ICPERE)","volume":"150 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 International Conference on Power Engineering and Renewable Energy (ICPERE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPERE.2012.6287222","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Making good balance between power demand growth-and power equipment installation is one of important issues of electric power companies. Appropriate strategies of managing existing power equipment and reinforcement are necessary for obtaining the maximum quality of electricity supply with the optimum energy cost. Strategies for the existing equipment include maintenance and replacement planning. In this article, a method to evaluate average annual cost for maintaining a transformer is introduced based on real failure data of transformers. Using the method, an economical service period of transformers can be eventually estimated. Cost analysis includes transformer's initial cost, maintenance cost, and cost in the event of failure. Analysis is performed using statistical data from PT. PLN Indonesia.
电力变压器经济使用期分析
平衡好电力需求增长与电力设备安装之间的关系是电力企业面临的重要问题之一。为了以最优的能源成本获得最高质量的电力供应,必须采取适当的策略来管理现有的电力设备和加固。现有设备的策略包括维护和更换计划。本文介绍了一种基于变压器实际故障数据计算变压器年平均维修费用的方法。利用该方法,最终可以估算出变压器的经济使用周期。成本分析包括变压器的初始成本、维护成本和故障成本。使用印尼PT. PLN的统计数据进行分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信