{"title":"SITUATIONAL ENTERPRISE MANAGEMENT BASED ON BUSINESS CONTINUITY MANAGEMENT STANDARDS AND PRACTICES","authors":"Y. Shchenikov","doi":"10.31799/978-5-8088-1558-2-2021-2-172-178","DOIUrl":null,"url":null,"abstract":"The article discusses the stages of business continuity management using the standard GOST R ISO 22301-2014. An example of a business impact analysis for an IT service is given. The stages of business continuity management implementation are considered. The structure of the BCP plan and its approximate content are given.","PeriodicalId":297099,"journal":{"name":"The Second All-Russian Scientific Conference","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Second All-Russian Scientific Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31799/978-5-8088-1558-2-2021-2-172-178","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The article discusses the stages of business continuity management using the standard GOST R ISO 22301-2014. An example of a business impact analysis for an IT service is given. The stages of business continuity management implementation are considered. The structure of the BCP plan and its approximate content are given.