Analysis of a Vendor Managed Consignment Inventory System with Kan-ban Withdrawals and Payment Delays

Ravi Kumar Ramrakhyani, M. S. Tootooni, N. Nagarur
{"title":"Analysis of a Vendor Managed Consignment Inventory System with Kan-ban Withdrawals and Payment Delays","authors":"Ravi Kumar Ramrakhyani, M. S. Tootooni, N. Nagarur","doi":"10.37266/ISER.2018V6I1.PP41-61","DOIUrl":null,"url":null,"abstract":"Vendor Managed Inventory (VMI) System with Consignment Inventory (CI) policy is a solution for many supply chain leaders in a highly competitive market. In this paper, totally eight different inventory supply chain models are studied. The profit function of supplier and manufacturer in different environments are compared in order to show the profitability of the overall supply chain management system in a manufacturing industry with different time horizons. The inventory systems are applied on a supply chain consisting of a single supplier and a manufacturer. The main focus of this study is to analyze the effect of payment deferral and the time value of money in push and pull (Kanban) manufacturing systems when VMI-CI policy is applied.","PeriodicalId":349010,"journal":{"name":"Industrial and Systems Engineering Review","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Industrial and Systems Engineering Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37266/ISER.2018V6I1.PP41-61","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Vendor Managed Inventory (VMI) System with Consignment Inventory (CI) policy is a solution for many supply chain leaders in a highly competitive market. In this paper, totally eight different inventory supply chain models are studied. The profit function of supplier and manufacturer in different environments are compared in order to show the profitability of the overall supply chain management system in a manufacturing industry with different time horizons. The inventory systems are applied on a supply chain consisting of a single supplier and a manufacturer. The main focus of this study is to analyze the effect of payment deferral and the time value of money in push and pull (Kanban) manufacturing systems when VMI-CI policy is applied.
具有禁制提款和付款延迟的供应商管理寄售库存系统分析
具有寄售库存(CI)政策的供应商管理库存(VMI)系统是许多供应链领导者在竞争激烈的市场中的解决方案。本文研究了八种不同的库存供应链模型。通过对供应商和制造商在不同环境下的利润函数进行比较,以显示制造业在不同时间范围内整个供应链管理系统的盈利能力。库存系统应用于由单个供应商和制造商组成的供应链。本研究的主要重点是分析在采用VMI-CI策略的推拉式(看板)制造系统中,延迟付款和货币时间价值的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信