The influence of non-functional requirements in UCP method on the accuracy of effort estimates

Jovan Popovic, Nenad Korolija, Ž. Marković, D. Bojic
{"title":"The influence of non-functional requirements in UCP method on the accuracy of effort estimates","authors":"Jovan Popovic, Nenad Korolija, Ž. Marković, D. Bojic","doi":"10.1109/TELFOR.2017.8249430","DOIUrl":null,"url":null,"abstract":"The Use Case Point method of effort estimation in software projects quantifies project size based on both functional and non-functional requirements. The latter ones are hard to assess and therefore often neglected. This paper presents a methodology for assessing the influence of non-functional requirements on the overall estimate. Two data sets of software projects are used for comparing the correlation between unadjusted and adjusted use case weights. Based on the results, the guidelines for software development effort estimation are concluded.","PeriodicalId":422501,"journal":{"name":"2017 25th Telecommunication Forum (TELFOR)","volume":"78 3","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 25th Telecommunication Forum (TELFOR)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TELFOR.2017.8249430","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The Use Case Point method of effort estimation in software projects quantifies project size based on both functional and non-functional requirements. The latter ones are hard to assess and therefore often neglected. This paper presents a methodology for assessing the influence of non-functional requirements on the overall estimate. Two data sets of software projects are used for comparing the correlation between unadjusted and adjusted use case weights. Based on the results, the guidelines for software development effort estimation are concluded.
UCP方法中非功能需求对工作量估算准确性的影响
软件项目中工作量估计的用例点方法根据功能和非功能需求量化项目规模。后者很难评估,因此经常被忽视。本文提出了一种评估非功能性需求对总体评估影响的方法。软件项目的两个数据集用于比较未调整和调整用例权重之间的相关性。在此基础上,总结了软件开发工作量估算的指导方针。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信