Li Ma, Li Zhou, Xuefei Zhang, Chuanyu Xiong, Xiaohong Liao, Lipin Sun
{"title":"Research on Power Grid Infrastructure Project Intelligent Management Platform Based on Digital Twin Technology","authors":"Li Ma, Li Zhou, Xuefei Zhang, Chuanyu Xiong, Xiaohong Liao, Lipin Sun","doi":"10.1109/ICPECA53709.2022.9719275","DOIUrl":null,"url":null,"abstract":"This paper builds a power grid infrastructure project planning and management platform through BIM, Internet of Things and artificial intelligence prediction and analysis based on digital twin technology. The platform realizes the interaction between physical engineering site and virtual engineering model, breaks the barriers of separate work and information delay in traditional planning methods, improves the accuracy and coordination of planning, realizes the “integration” in three rate of planning process, and further optimizes and improves the preparation mode of power grid infrastructure project planning.","PeriodicalId":244448,"journal":{"name":"2022 IEEE 2nd International Conference on Power, Electronics and Computer Applications (ICPECA)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE 2nd International Conference on Power, Electronics and Computer Applications (ICPECA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPECA53709.2022.9719275","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper builds a power grid infrastructure project planning and management platform through BIM, Internet of Things and artificial intelligence prediction and analysis based on digital twin technology. The platform realizes the interaction between physical engineering site and virtual engineering model, breaks the barriers of separate work and information delay in traditional planning methods, improves the accuracy and coordination of planning, realizes the “integration” in three rate of planning process, and further optimizes and improves the preparation mode of power grid infrastructure project planning.