Episodes of renewal (c. AD 90–110)

D. Perring
{"title":"Episodes of renewal (c. AD 90–110)","authors":"D. Perring","doi":"10.1093/oso/9780198789000.003.0012","DOIUrl":null,"url":null,"abstract":"The pace of urban growth in London appears to have slowed in the period immediately after Agricola’s governorship. At the end of the first century, however, London’s port saw extensive repair and enlargement. Harbour improvements commenced c. AD 94–8, perhaps under Nerva’s administration. It is argued that these works were part of a wider programme of support for the annona, designed to secure the army’s support for the new political regime. These harbour works were resumed under Trajan, when improvements were also made to the hydraulic engineering represented by wells and water-lifting devices. Several baths were built or improved at around this time, some of which may have been attached to temple precincts near the borders of the settlement.","PeriodicalId":293911,"journal":{"name":"London in the Roman World","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"London in the Roman World","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/oso/9780198789000.003.0012","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The pace of urban growth in London appears to have slowed in the period immediately after Agricola’s governorship. At the end of the first century, however, London’s port saw extensive repair and enlargement. Harbour improvements commenced c. AD 94–8, perhaps under Nerva’s administration. It is argued that these works were part of a wider programme of support for the annona, designed to secure the army’s support for the new political regime. These harbour works were resumed under Trajan, when improvements were also made to the hydraulic engineering represented by wells and water-lifting devices. Several baths were built or improved at around this time, some of which may have been attached to temple precincts near the borders of the settlement.
复兴时期(约公元90-110年)
在阿格里科拉担任市长后不久,伦敦的城市发展速度似乎有所放缓。然而,在一世纪末,伦敦的港口经历了大规模的维修和扩建。港口的改善开始于公元94-8年,可能是在涅尔瓦的统治下。有人认为,这些作品是支持安纳纳的更广泛计划的一部分,旨在确保军队对新政治政权的支持。这些港口工程在图拉真统治下恢复,同时也改进了以井和举水装置为代表的水力工程。大约在这个时候,建造或改进了几个浴室,其中一些可能附属于定居点边界附近的寺庙区域。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信