Modeling of processing capacity of terminal and logistics facilities of the Nizhneleninskoye (RF) –Tongjiang (PRC) railway border crossing

R. Korol, S. D. Podolinnaya
{"title":"Modeling of processing capacity of terminal and logistics facilities of the Nizhneleninskoye (RF) –Tongjiang (PRC) railway border crossing","authors":"R. Korol, S. D. Podolinnaya","doi":"10.20291/2079-0392-2023-1-52-63","DOIUrl":null,"url":null,"abstract":"The workload of terminal and warehouse facilities of the transport and logistics center «Nizhneleninskoye» under construction, accompanying the railway bridge crossing Nizhneleninskoye (RF) - Tongjiang (PRC), is investigated. The transport and terminal logistics infrastructure of the Nizhneleninskoye - Tongjiang border crossing is considered. The paper uses theoretical research methods, including modeling, visualization and comparison. Crossborder infrastructure projects, including railway and automobile bridge crossings, are considered, indicating the existing and prospective capacity. The technical and operational characteristics of the transport and terminal logistics infrastructure of the Nizhneleninskoye - Tongjiang railway border crossing are given. The technical and technological parameters of the warehouse complex of the transport and logistics center Nizhneleninskoe are described. The results of two modeling scenarios are presented - at the first stage of operation of the transport and logistics center «Nizhneleninskoe» and at the second stage of operation with infrastructure development for prospective cargo handling. With the increase in the incoming cargo flow by 2.5 times at the second stage of operation of the warehouse complex, during the simulation, the load of the storage area of the warehouse complex increased by 40%, the load of lifting and transport equipment increased, which affected the reduction in the number of handled and shipped loaded vehicles. In order to speed up intra-warehouse operations, it is proposed to develop options for moving lifting and transport equipment, designate «hot» and «cold» zones of the warehouse, determine the required staff numbers with distribution by working positions, draw up technological maps and daily work schedules of the warehouse.","PeriodicalId":118708,"journal":{"name":"Herald of the Ural State University of Railway Transport","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Herald of the Ural State University of Railway Transport","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20291/2079-0392-2023-1-52-63","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The workload of terminal and warehouse facilities of the transport and logistics center «Nizhneleninskoye» under construction, accompanying the railway bridge crossing Nizhneleninskoye (RF) - Tongjiang (PRC), is investigated. The transport and terminal logistics infrastructure of the Nizhneleninskoye - Tongjiang border crossing is considered. The paper uses theoretical research methods, including modeling, visualization and comparison. Crossborder infrastructure projects, including railway and automobile bridge crossings, are considered, indicating the existing and prospective capacity. The technical and operational characteristics of the transport and terminal logistics infrastructure of the Nizhneleninskoye - Tongjiang railway border crossing are given. The technical and technological parameters of the warehouse complex of the transport and logistics center Nizhneleninskoe are described. The results of two modeling scenarios are presented - at the first stage of operation of the transport and logistics center «Nizhneleninskoe» and at the second stage of operation with infrastructure development for prospective cargo handling. With the increase in the incoming cargo flow by 2.5 times at the second stage of operation of the warehouse complex, during the simulation, the load of the storage area of the warehouse complex increased by 40%, the load of lifting and transport equipment increased, which affected the reduction in the number of handled and shipped loaded vehicles. In order to speed up intra-warehouse operations, it is proposed to develop options for moving lifting and transport equipment, designate «hot» and «cold» zones of the warehouse, determine the required staff numbers with distribution by working positions, draw up technological maps and daily work schedules of the warehouse.
下列宁斯科伊—同江铁路口岸终端处理能力及物流设施建模
对正在建设中的运输和物流中心«Nizhneleninskoye»的码头和仓库设施的工作量进行了调查,同时对横跨Nizhneleninskoye (RF) -通江(PRC)的铁路桥进行了调查。考虑了下列宁斯科耶-通江口岸的运输和终端物流基础设施。本文采用理论研究方法,包括建模、可视化和对比。考虑跨境基础设施项目,包括铁路和汽车桥梁,表明现有和未来的能力。介绍了下宁斯科耶—通江铁路口岸运输和终端物流基础设施的技术特点和运行特点。介绍了下列宁斯克运输物流中心仓库综合体的技术和工艺参数。介绍了两种建模情景的结果-在运输和物流中心«Nizhneleninskoe»的第一阶段运营和在未来货物处理的基础设施发展的第二阶段运营。在仓库综合体第二阶段运行时,随着进站货流量增加2.5倍,在模拟过程中,仓库综合体储存区的负荷增加了40%,起重和运输设备的负荷增加,影响了装卸装载车辆数量的减少。为了加快仓库内的作业,建议制定移动起重和运输设备的方案,指定仓库的“热”和“冷”区,确定按工作岗位分配的所需工作人员人数,绘制技术地图和仓库的日常工作时间表。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信