{"title":"Protection challenges facing Distributed Generation on rural feeders","authors":"A. Foss, Kalle E. Leppik","doi":"10.1109/EPEC.2010.5697226","DOIUrl":null,"url":null,"abstract":"Experience with connecting farm biogas generation to rural distribution feeders in Ontario has revealed several challenges with electrical protection. The biogas projects are small (<500kW), synchronous, farm-based, and looking for an affordable protection solution involving the use of only low-voltage equipments. The utility feeders are generally at the 8.3kV and 12.5kV voltage levels, can involve long lengths and contain significant imbalance due to the presence of single-phase laterals. The main challenges arise from two requirements.","PeriodicalId":393869,"journal":{"name":"2010 IEEE Electrical Power & Energy Conference","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE Electrical Power & Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPEC.2010.5697226","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Experience with connecting farm biogas generation to rural distribution feeders in Ontario has revealed several challenges with electrical protection. The biogas projects are small (<500kW), synchronous, farm-based, and looking for an affordable protection solution involving the use of only low-voltage equipments. The utility feeders are generally at the 8.3kV and 12.5kV voltage levels, can involve long lengths and contain significant imbalance due to the presence of single-phase laterals. The main challenges arise from two requirements.