{"title":"Simulation Method for Multiperiod Panoramic Operation of New Energy Power System in Complex Environment","authors":"Xin Zhang","doi":"10.1109/iceert53919.2021.00008","DOIUrl":null,"url":null,"abstract":"In order to quantify and evaluate the technical economy of power system operation plan in complex environment, a multi-period panoramic operation simulation method of new energy power system is proposed. Based on the complexity analysis of multi-period coordinated panoramic operation simulation, the time series load modeling is carried out and the new energy output model is constructed. After calculating the waste power of new energy, the frame of multi-period panoramic operation simulation is constructed and the timing operation simulation is completed. Finally, a practical example is given to demonstrate the effectiveness and advancement of the panoramic simulation scheme.","PeriodicalId":278054,"journal":{"name":"2021 International Conference on Information Control, Electrical Engineering and Rail Transit (ICEERT)","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Conference on Information Control, Electrical Engineering and Rail Transit (ICEERT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/iceert53919.2021.00008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In order to quantify and evaluate the technical economy of power system operation plan in complex environment, a multi-period panoramic operation simulation method of new energy power system is proposed. Based on the complexity analysis of multi-period coordinated panoramic operation simulation, the time series load modeling is carried out and the new energy output model is constructed. After calculating the waste power of new energy, the frame of multi-period panoramic operation simulation is constructed and the timing operation simulation is completed. Finally, a practical example is given to demonstrate the effectiveness and advancement of the panoramic simulation scheme.