Scheduling the Slovenian cascaded hydro system on the river Sava

B. Kladnik, G. Artac, B. Kozan, A. Gubina, K. Nagode, M. Dušak
{"title":"Scheduling the Slovenian cascaded hydro system on the river Sava","authors":"B. Kladnik, G. Artac, B. Kozan, A. Gubina, K. Nagode, M. Dušak","doi":"10.1109/AFRCON.2011.6072098","DOIUrl":null,"url":null,"abstract":"Short-term scheduling of a cascade of run-of-river hydro power plants is always a challenge. In the paper, a quadratic programming approach is used to solve this problem for the hydro power plant chain on the Slovenian Sava River. The approach considers head-dependency and discharge ramping constraints and takes the nonlinear connection between the water discharge and, the head and the power generation. The model has been tested using measured data on hydro flows and the technical data on the Sava River power plants.","PeriodicalId":125684,"journal":{"name":"IEEE Africon '11","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Africon '11","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AFRCON.2011.6072098","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Short-term scheduling of a cascade of run-of-river hydro power plants is always a challenge. In the paper, a quadratic programming approach is used to solve this problem for the hydro power plant chain on the Slovenian Sava River. The approach considers head-dependency and discharge ramping constraints and takes the nonlinear connection between the water discharge and, the head and the power generation. The model has been tested using measured data on hydro flows and the technical data on the Sava River power plants.
在萨瓦河上调度斯洛文尼亚级联水力系统
水电站梯级的短期调度一直是一个挑战。本文采用二次规划方法对斯洛文尼亚萨瓦河上的水电站链进行了求解。该方法考虑了水头依赖性和流量斜坡约束,并考虑了水头与发电、水头与发电之间的非线性关系。该模型已使用水力流量的实测数据和萨瓦河电厂的技术数据进行了测试。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信