The assembly task allocation method for the mass customization on modularization

Huihui Liu
{"title":"The assembly task allocation method for the mass customization on modularization","authors":"Huihui Liu","doi":"10.1109/ICMSE.2014.6930264","DOIUrl":null,"url":null,"abstract":"According to the characteristics of mass customization assembly on modularization, the module being considered as assembly unit, and from the beginning of the task decomposition of assemblies, the conditions that the module to be the sub-assembly should meet and the principles of assembly task decomposition in the mass customization assembly on modularization are analyzed, the task allocation model based on the improved difference method is established, the model and the solving process is validated by a case. So the purpose on improving the assembly efficiency of mass customization and shortening the response time of customer demand is achieved.","PeriodicalId":197239,"journal":{"name":"2014 International Conference on Management Science & Engineering 21th Annual Conference Proceedings","volume":"316 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 International Conference on Management Science & Engineering 21th Annual Conference Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMSE.2014.6930264","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

According to the characteristics of mass customization assembly on modularization, the module being considered as assembly unit, and from the beginning of the task decomposition of assemblies, the conditions that the module to be the sub-assembly should meet and the principles of assembly task decomposition in the mass customization assembly on modularization are analyzed, the task allocation model based on the improved difference method is established, the model and the solving process is validated by a case. So the purpose on improving the assembly efficiency of mass customization and shortening the response time of customer demand is achieved.
基于模块化的大规模定制装配任务分配方法
根据模块化大规模定制装配的特点,将模块视为装配单元,从装配件任务分解开始,分析了模块化大规模定制装配中作为子装配件的模块应满足的条件和装配件任务分解原则,建立了基于改进差分法的任务分配模型;通过算例验证了该模型和求解过程。从而达到了提高大规模定制装配效率和缩短客户需求响应时间的目的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信