Optimal monitoring and management of a water storage with pollution constraints

I. Ioslovich, P. Gutman
{"title":"Optimal monitoring and management of a water storage with pollution constraints","authors":"I. Ioslovich, P. Gutman","doi":"10.1109/MED.2006.328851","DOIUrl":null,"url":null,"abstract":"The aim is to fill water storage with potable water of a given quality, for subsequent treatment and distribution to a water conveying system. During a given period, a set of several pumping stations is working to deliver water from different sources at different locations. A multi-stage control process is considered whereby the total pumping time is divided into short sampling intervals. The intensity of pumping as a function of time is the control variable. It is assumed that there exists a reliable forecast of every pollutant as a function of time and water source. The amount of the pollutants is constrained in the final mass of water in the storage. The mass of water at the end of the operation period should be maximized","PeriodicalId":347035,"journal":{"name":"2006 14th Mediterranean Conference on Control and Automation","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 14th Mediterranean Conference on Control and Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MED.2006.328851","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The aim is to fill water storage with potable water of a given quality, for subsequent treatment and distribution to a water conveying system. During a given period, a set of several pumping stations is working to deliver water from different sources at different locations. A multi-stage control process is considered whereby the total pumping time is divided into short sampling intervals. The intensity of pumping as a function of time is the control variable. It is assumed that there exists a reliable forecast of every pollutant as a function of time and water source. The amount of the pollutants is constrained in the final mass of water in the storage. The mass of water at the end of the operation period should be maximized
具有污染约束的水库的最优监测与管理
目的是用给定质量的饮用水填满储水,供后续处理和分配到输水系统。在一段时间内,一组几个抽水站正在努力从不同地点的不同水源输送水。考虑了一个多阶段控制过程,其中将总抽运时间划分为短采样间隔。泵送强度作为时间的函数是控制变量。假定每种污染物作为时间和水源的函数存在可靠的预报。污染物的数量受限于储存水的最终质量。运行期结束时的水量应达到最大
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信