Perancangan Sistem Basis Data Neraca Energi pada Sistem Kelistrikan Interkoneksi Sulawesi Utara dan Gorontalo

Mudakir Mudakir, Tedi Tri Yulianto, Sukma Patrya
{"title":"Perancangan Sistem Basis Data Neraca Energi pada Sistem Kelistrikan Interkoneksi Sulawesi Utara dan Gorontalo","authors":"Mudakir Mudakir, Tedi Tri Yulianto, Sukma Patrya","doi":"10.17977/um068v1i82021p612-629","DOIUrl":null,"url":null,"abstract":"PT PLN (Persero) Minahasa System Load Regulatory Implementation Unit is a unit of PT PLN (Persero) which is responsible for managing generator loading arrangements and substation settings in the North Sulawesi and Gorontalo Interconnection Systems. In this unit there is a section that handles the calculation of the amount of energy produced by the Generator and the energy sent to Distribution with the aim of calculating Transmission Loss which is still done manually in the form of Minutes of Recording kWh meters so that many obstacles occur in the field such as the distance between the main substation and Remote generators take time to take the Minutes form for kWh meter readings. This Energy Balance Database System is an application to support the performance of related units in accelerating the calculation of Transmission losses. This application system is designed on a web-based basis to display data in infographic form to make it easier to display energy recording data from each measured transaction point. This system is also designed to be able to carry out gradual data verification (from operator to management) to ensure the accuracy of data entered by substation operators and power plant operators. With this database system, it is hoped that reporting of transmission losses can be done more quickly because of the many unit performances related to the speed and accuracy of this transmission loss data. \nPT PLN (Persero) Unit Pelaksanan Pengatur beban Sistem Minahasa merupakan unit dari PT PLN (Persero) yang bertanggung jawab mengelola pengaturan pembebanan pembangkit dan pemgaturan Gardu Induk pada Sistem Interkoneksi Sulawesi Utara dan Gorontalo. Pada unit tersebut terdapat bagian yang menangani perhitungan jumlah energi yang dihasilkan oleh Pembangkit dan energi yang dikirimkan ke Distribusi dengan tujuan untuk mengitung Susut Transmisi yang masih dilakukan manual dalam bentuk formulir Berita Acara Pencatatan kWh meter sehingga banyak kendala yang terjadi dilapangan seperti jarak antar gardu Induk dan Pembangkit yang jauh memakan waktu untuk pengambilan form Berita Acara (B.A.) Pembacaan kWh meter. Sistem Basis Data Neraca Energi ini merupakan aplikasi pendukung kinerja unit terkait dalam mempercepat perhitungan susut Tramsisi. Sistem aplikasi ini Dirancang berbasis web untuk menampilkan data dalam bentuk infografis untuk lebih mempermudah dalam menampilkan data pencatatan energi dati setiap titik transaksi yang diukur. Sistem ini juga dirancang untuk dapat dilakukan verifikasi data secara berjencang ( dari operator sampai Management) untuk menjamin akurasi data yang dimasukkan oleh operator Gardu Induk dan operator Pembangkit. Dengan adanya sistem basis data ini diharapkan pelaporan susut transmisi dapat dilakukan lebih cepat karena banyaknya kinerja unit yang terkait dengan kecepatan dan akurasi data susut Transmisi ini.","PeriodicalId":221326,"journal":{"name":"Jurnal Inovasi Teknologi dan Edukasi Teknik","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Inovasi Teknologi dan Edukasi Teknik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17977/um068v1i82021p612-629","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT PLN (Persero) Minahasa System Load Regulatory Implementation Unit is a unit of PT PLN (Persero) which is responsible for managing generator loading arrangements and substation settings in the North Sulawesi and Gorontalo Interconnection Systems. In this unit there is a section that handles the calculation of the amount of energy produced by the Generator and the energy sent to Distribution with the aim of calculating Transmission Loss which is still done manually in the form of Minutes of Recording kWh meters so that many obstacles occur in the field such as the distance between the main substation and Remote generators take time to take the Minutes form for kWh meter readings. This Energy Balance Database System is an application to support the performance of related units in accelerating the calculation of Transmission losses. This application system is designed on a web-based basis to display data in infographic form to make it easier to display energy recording data from each measured transaction point. This system is also designed to be able to carry out gradual data verification (from operator to management) to ensure the accuracy of data entered by substation operators and power plant operators. With this database system, it is hoped that reporting of transmission losses can be done more quickly because of the many unit performances related to the speed and accuracy of this transmission loss data. PT PLN (Persero) Unit Pelaksanan Pengatur beban Sistem Minahasa merupakan unit dari PT PLN (Persero) yang bertanggung jawab mengelola pengaturan pembebanan pembangkit dan pemgaturan Gardu Induk pada Sistem Interkoneksi Sulawesi Utara dan Gorontalo. Pada unit tersebut terdapat bagian yang menangani perhitungan jumlah energi yang dihasilkan oleh Pembangkit dan energi yang dikirimkan ke Distribusi dengan tujuan untuk mengitung Susut Transmisi yang masih dilakukan manual dalam bentuk formulir Berita Acara Pencatatan kWh meter sehingga banyak kendala yang terjadi dilapangan seperti jarak antar gardu Induk dan Pembangkit yang jauh memakan waktu untuk pengambilan form Berita Acara (B.A.) Pembacaan kWh meter. Sistem Basis Data Neraca Energi ini merupakan aplikasi pendukung kinerja unit terkait dalam mempercepat perhitungan susut Tramsisi. Sistem aplikasi ini Dirancang berbasis web untuk menampilkan data dalam bentuk infografis untuk lebih mempermudah dalam menampilkan data pencatatan energi dati setiap titik transaksi yang diukur. Sistem ini juga dirancang untuk dapat dilakukan verifikasi data secara berjencang ( dari operator sampai Management) untuk menjamin akurasi data yang dimasukkan oleh operator Gardu Induk dan operator Pembangkit. Dengan adanya sistem basis data ini diharapkan pelaporan susut transmisi dapat dilakukan lebih cepat karena banyaknya kinerja unit yang terkait dengan kecepatan dan akurasi data susut Transmisi ini.
设计了北苏拉威西和Gorontalo电力互联系统的能源资产负债表数据
PT PLN (Persero) Minahasa系统负荷管理实施单位是PT PLN (Persero)的一个单位,负责管理北苏拉威西和Gorontalo互联系统的发电机负荷安排和变电站设置。在这个单元中,有一个部分处理发电机产生的能量和发送给配电的能量的计算,目的是计算传输损耗,这仍然是以记录千瓦时表的分钟形式手动完成的,因此在现场发生许多障碍,例如主变电站和远程发电机之间的距离需要时间来获取千瓦时表读数的分钟形式。该能量平衡数据库系统是一个应用程序,以支持相关单位的性能,加快传输损耗的计算。本应用系统是基于网络设计的,以信息图表的形式显示数据,以便于显示每个测量交易点的能源记录数据。该系统还可以进行逐步的数据验证(从操作员到管理),以确保变电站操作员和发电厂操作员输入的数据的准确性。有了这个数据库系统,由于许多单元性能与传输损耗数据的速度和准确性有关,因此希望能够更快地完成传输损耗的报告。PT PLN (Persero) Unit Pelaksanan Pengatur beban system Minahasa merupakan Unit dari PT PLN (Persero) Unit yang bertanggung jawab mengelola pengaturan pembanan pembangkit dan pemgaturan Gardu Induk pada system Interkoneksi Sulawesi Utara dan Gorontalo。Pada单位teresbut terdapat bagian yang menangani perhitungan jumlah energi yang dihasilkan oleh pemakilkan oleh pemakilkan oleh pemakilkan oleh pemakilkan oleh pemakilkan dalam bentuk公式Berita Acara Pencatatan kWh meter sehinga banyak kendala yang terjadi perangan jarak antar gardu Induk dan Pembangkit yang jauh memakan waktu untuk pengambilan form Berita Acara (ba)Pembacaan kWh电表。Sistem基础数据Neraca Energi ini merupakan aplikasi pendukung kinerja单位terkait dalam mempercepat perhitungan susut Tramsisi。系统的应用包括:基础网络、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据、基础数据等。system ini juga dirancang untuk dapat dilakukan verifikasi data secara berjencang (dari运营商sampai Management) untuk menjamin akurasi data yang dimasukkan oleh运营商Gardu Induk dan运营商Pembangkit。Dengan adanya系统基础数据ini diharapkan pelaporan susut传输dapat dilakukan lebih cepat karena banyaknya kinerja单元yang terkait Dengan keepatan danakurasi数据susut传输。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信