Application of project management software in turnkey electrification projects in Ghana

Zachariah Pabi Gariba
{"title":"Application of project management software in turnkey electrification projects in Ghana","authors":"Zachariah Pabi Gariba","doi":"10.1109/CYBER.2014.6917539","DOIUrl":null,"url":null,"abstract":"This study establishes the use of software to provide efficiency for turnkey electrification projects in Ghana. A correlation design method is employed to a sample of thirty one stakeholders in the power distribution sector in Ghana, and it reveals that there is negative perceived ease of use of software for managements of electrical turnkey projects. T-Test conducted on usage of PM software indicated that statistically there is no usage of PM software and those projects are manually managed in Ghana.","PeriodicalId":183401,"journal":{"name":"The 4th Annual IEEE International Conference on Cyber Technology in Automation, Control and Intelligent","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-06-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The 4th Annual IEEE International Conference on Cyber Technology in Automation, Control and Intelligent","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CYBER.2014.6917539","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This study establishes the use of software to provide efficiency for turnkey electrification projects in Ghana. A correlation design method is employed to a sample of thirty one stakeholders in the power distribution sector in Ghana, and it reveals that there is negative perceived ease of use of software for managements of electrical turnkey projects. T-Test conducted on usage of PM software indicated that statistically there is no usage of PM software and those projects are manually managed in Ghana.
项目管理软件在加纳交钥匙电气化项目中的应用
本研究建立了软件的使用,为加纳的交钥匙电气化项目提供效率。相关设计方法用于加纳配电部门的31个利益相关者的样本,它揭示了对电气交钥匙项目管理的软件易用性的负面感知。对PM软件的使用情况进行的t检验表明,统计上没有PM软件的使用,这些项目在加纳是手工管理的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信