{"title":"REDUCING THE LOSS OF WORKING TIME WHEN PERFORMING MAINTENANCE AND REPAIR OF CARS","authors":"Shaikhov Rinat Fidarisovich","doi":"10.33979/2073-7432-2021-75-4-112-119","DOIUrl":null,"url":null,"abstract":"The purpose of this study is to develop recommendations for improving labor productivity at a car service company by reducing the loss of working time. It is advisable to determine the loss of working time using the method of photography of the working day. As a result of the analysis of the company's activities, the most popular service was identified - repair of gearboxes. Using the ex-ample of this service, the distribution of the working hours of performers is shown, and unjustified losses are analyzed. To reduce them, a set of measures is proposed, involving additional prepara-tory and final operations with a labor intensity of 0.1 to 0.3 hours, which will reduce the labor in-tensity of the services provided by 9%.","PeriodicalId":178900,"journal":{"name":"World of transport and technological machines","volume":"238 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World of transport and technological machines","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33979/2073-7432-2021-75-4-112-119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The purpose of this study is to develop recommendations for improving labor productivity at a car service company by reducing the loss of working time. It is advisable to determine the loss of working time using the method of photography of the working day. As a result of the analysis of the company's activities, the most popular service was identified - repair of gearboxes. Using the ex-ample of this service, the distribution of the working hours of performers is shown, and unjustified losses are analyzed. To reduce them, a set of measures is proposed, involving additional prepara-tory and final operations with a labor intensity of 0.1 to 0.3 hours, which will reduce the labor in-tensity of the services provided by 9%.