Instant Construction Design Environmentally Friendly for Building a New Classroom School

Paikun, Riyan Rizkiyansah, Mira Novita, Ari Riana, A. O. Irlan
{"title":"Instant Construction Design Environmentally Friendly for Building a New Classroom School","authors":"Paikun, Riyan Rizkiyansah, Mira Novita, Ari Riana, A. O. Irlan","doi":"10.1109/ICCED51276.2020.9415823","DOIUrl":null,"url":null,"abstract":"The construction of classrooms which are the main means of education and learning activities is always carried out every year, to meet the needs of classrooms which in 2020 are now experiencing a shortage of 15,931 classrooms. The implementation of school construction so far in Indonesia has been carried out in a self-managed manner, and the construction system uses conventional methods, so it requires a lot of human resources, requires a very long time, and always leaves construction waste. The existing precast construction method is still limited to certain building components, so if the implementation of classroom construction uses the precast method, it is still combined with conventional methods and only speeds up the time a little, and still leaves construction waste, therefore there needs to be a solution so that the implementation of classroom construction does not require a lot of human resources, does not require a long time, and does not leave construction waste. To solve this problem, this research offers an instant school room construction design solution, as a method of implementing the construction of new classrooms. This study uses a pure experimental method and results in the construction design of all building components in classroom construction, including modules of sloop structure components, main columns, beams, walls, floors and roof truss. With this design building components can be produced precast, so that the implementation of the construction of new classrooms at school locations, only providing locations that are ready, then assembling all building components that are produced precast. Using this design can build new classrooms quickly, does not require a lot of human resources, and does not leave construction waste. The design of instant construction of new classrooms in schools, is the right solution as an environmentally friendly method of construction.","PeriodicalId":344981,"journal":{"name":"2020 6th International Conference on Computing Engineering and Design (ICCED)","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 6th International Conference on Computing Engineering and Design (ICCED)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCED51276.2020.9415823","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The construction of classrooms which are the main means of education and learning activities is always carried out every year, to meet the needs of classrooms which in 2020 are now experiencing a shortage of 15,931 classrooms. The implementation of school construction so far in Indonesia has been carried out in a self-managed manner, and the construction system uses conventional methods, so it requires a lot of human resources, requires a very long time, and always leaves construction waste. The existing precast construction method is still limited to certain building components, so if the implementation of classroom construction uses the precast method, it is still combined with conventional methods and only speeds up the time a little, and still leaves construction waste, therefore there needs to be a solution so that the implementation of classroom construction does not require a lot of human resources, does not require a long time, and does not leave construction waste. To solve this problem, this research offers an instant school room construction design solution, as a method of implementing the construction of new classrooms. This study uses a pure experimental method and results in the construction design of all building components in classroom construction, including modules of sloop structure components, main columns, beams, walls, floors and roof truss. With this design building components can be produced precast, so that the implementation of the construction of new classrooms at school locations, only providing locations that are ready, then assembling all building components that are produced precast. Using this design can build new classrooms quickly, does not require a lot of human resources, and does not leave construction waste. The design of instant construction of new classrooms in schools, is the right solution as an environmentally friendly method of construction.
新型教室学校的即时环保施工设计
教室是教育和学习活动的主要手段,每年都要进行教室建设,以满足教室的需求,到2020年,教室短缺15931间。印尼目前实施的学校建设都是以自我管理的方式进行的,施工系统采用常规的方法,所以需要大量的人力资源,需要很长的时间,而且总是留下建筑垃圾。现有的预制施工方法仍然局限于某些建筑构件,因此如果使用预制施工方法实施教室建设,仍然是与常规方法相结合,只是加快了一点时间,并且仍然留下了建筑垃圾,因此需要有一个解决方案,使教室建设的实施不需要大量的人力资源,不需要很长时间,不留下建筑垃圾。为了解决这一问题,本研究提出了一个即时教室建设设计方案,作为实施新教室建设的一种方法。本研究采用纯实验的方法,对教室建筑中所有建筑构件进行了结构设计,包括单桅结构构件、主柱、梁、墙、楼板、屋架等模块。通过这种设计,建筑构件可以预制生产,因此在学校地点实施新教室的建设,只提供准备好的位置,然后组装所有预制生产的建筑构件。采用这种设计可以快速建造新教室,不需要大量的人力资源,也不会留下建筑垃圾。学校新教室的即时建造设计,作为一种环保的施工方法是正确的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信