{"title":"Instrumentation, control and electrical systems strategy for a new US cement plant","authors":"J. Kemmerer","doi":"10.1109/CITCON.1988.13249","DOIUrl":null,"url":null,"abstract":"Many factors must be considered to accomplish a low-cost strategy; site selection, process selection, and equipment selection are a few of the major factors. After these selections are made, the design of the instrumentation and control systems provide a major area of opportunity. The author provides an overview of these systems. The plant of interest is a 1-million-ton-/yr dry process plant consisting of a four-stage precalciner preheater feeding a 14'6\" kiln, and an eight-compartment ventless grate cooler. Issues discussed are process control, process design and control systems, and operator interface. It is concluded that the resulting plant is a low-cost facility with impressive credentials, e.g. heat consumption at 8% below guarantee and power consumption at 95 kW/ST.<<ETX>>","PeriodicalId":118848,"journal":{"name":"30th IEEE Cement Industry Technical Conference","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"30th IEEE Cement Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITCON.1988.13249","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Many factors must be considered to accomplish a low-cost strategy; site selection, process selection, and equipment selection are a few of the major factors. After these selections are made, the design of the instrumentation and control systems provide a major area of opportunity. The author provides an overview of these systems. The plant of interest is a 1-million-ton-/yr dry process plant consisting of a four-stage precalciner preheater feeding a 14'6" kiln, and an eight-compartment ventless grate cooler. Issues discussed are process control, process design and control systems, and operator interface. It is concluded that the resulting plant is a low-cost facility with impressive credentials, e.g. heat consumption at 8% below guarantee and power consumption at 95 kW/ST.<>