A new look at investment risk – the organic risk management stance?

Yen Yee Chong
{"title":"A new look at investment risk – the organic risk management stance?","authors":"Yen Yee Chong","doi":"10.1108/09657960310480624","DOIUrl":null,"url":null,"abstract":"The author suggests that methods for rating investment risk are flawed. He suggests a risk analysis, management and projects (RAMP) approach. Number‐crunching will produce better results than listening to analysts.","PeriodicalId":299727,"journal":{"name":"Balance Sheet","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Balance Sheet","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/09657960310480624","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The author suggests that methods for rating investment risk are flawed. He suggests a risk analysis, management and projects (RAMP) approach. Number‐crunching will produce better results than listening to analysts.
投资风险的新视角——有机风险管理立场?
作者认为,投资风险评级方法存在缺陷。他建议采用风险分析、管理和项目(RAMP)方法。数据处理会比听分析师的话产生更好的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信