{"title":"PENERAPAN STRUKTUR PONDASI TITIK SEBAGAI PENGGANTI PONDASI BATU BATA DALAM UPAYA PENCAPAIAN BIAYA YANG LEBIH EKONOMIS (STUDI KASUS RUMAH JABATAN PUSKESMAS KUMBE KABUPATEN MERAUKE)","authors":"Biatma Syanjayanta, Hilarius Chandra Syanjayakusuma, Julvan Rifai Patiekom","doi":"10.35724/MJA.V1I01.1329","DOIUrl":null,"url":null,"abstract":"Merauke Regency is a coastal area with muddy soil conditions, Merauke district is a very rare area of sand and gravel material, because of these conditions the community and housing business actors use red brick as a foundation structure material for houses, especially simple housing. Meanwhile, generally red bricks have a non-structural function.In this study the author tries to plan and compare costs in terms of the design model of the continuous foundation structure of red bricks with a point structure design model, in order to achieve a safe, comfortable and economical design result.This research was conducted by direct observation (survey) to the research location, namely in the Kumbe health center, Malind district, Merauke district. In addition, the author also conducted a literature study on the standards of prices and wages in the related institutions, analyzed the prices of the plan drawings, concluded the results of the research so that it became an input for the government / related agencies and the community.From the results of this study, it can be concluded that there is a very significant price difference. The difference reaches Rp. 14,670,000.00, where the design of a continuous foundation with a total length of its foundation is 60,953 M1, the cost reaches Rp. 41,120,000.00. While the design of the point foundation with the same total length, the cost only reaches Rp. 26,450,000.00. \n  \nKata kunci : Struktur Pondasi Titik., Estimasi Teknis., Struktur Pondasi Menerus.","PeriodicalId":350440,"journal":{"name":"Musamus Journal of Architecture","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Musamus Journal of Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35724/MJA.V1I01.1329","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Merauke Regency is a coastal area with muddy soil conditions, Merauke district is a very rare area of sand and gravel material, because of these conditions the community and housing business actors use red brick as a foundation structure material for houses, especially simple housing. Meanwhile, generally red bricks have a non-structural function.In this study the author tries to plan and compare costs in terms of the design model of the continuous foundation structure of red bricks with a point structure design model, in order to achieve a safe, comfortable and economical design result.This research was conducted by direct observation (survey) to the research location, namely in the Kumbe health center, Malind district, Merauke district. In addition, the author also conducted a literature study on the standards of prices and wages in the related institutions, analyzed the prices of the plan drawings, concluded the results of the research so that it became an input for the government / related agencies and the community.From the results of this study, it can be concluded that there is a very significant price difference. The difference reaches Rp. 14,670,000.00, where the design of a continuous foundation with a total length of its foundation is 60,953 M1, the cost reaches Rp. 41,120,000.00. While the design of the point foundation with the same total length, the cost only reaches Rp. 26,450,000.00.   Kata kunci : Struktur Pondasi Titik., Estimasi Teknis., Struktur Pondasi Menerus.
实施点基础结构以取代砖房基础,努力获得更经济的成本(梅尔克区PUSKESMAS KUMBE个案研究)
Merauke摄政区是一个具有泥泞土壤条件的沿海地区,Merauke区是一个非常罕见的砂砾材料地区,由于这些条件,社区和住房企业演员使用红砖作为房屋的基础结构材料,特别是简单的房屋。同时,红砖一般具有非结构功能。在本研究中,笔者尝试用点结构设计模型对红砖连续基础结构的设计模型进行成本规划和比较,以达到安全、舒适、经济的设计结果。本研究采用直接观察(调查)的方法,对研究地点,即马林德区、梅罗克区Kumbe卫生中心进行调查。此外,作者还对相关机构的物价和工资标准进行了文献研究,分析了规划图纸的价格,总结了研究结果,为政府/相关机构和社会提供了参考。从本研究的结果,可以得出结论,存在非常显著的价格差异。差额为14,670,000.00卢比,其中设计连续基础,其基础总长度为60,953 M1,费用为4,1,120,000.00卢比。而总长度相同的点基础设计,费用仅为Rp. 26,450,000。Kata kunci: struckturr Pondasi Titik。, Estimasi Teknis。, Struktur Pondasi Menerus。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信